Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 95 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) ERECTION OF EXTENSION TO EXISTING PACKAGING BUILDING ON GROUND AND FIRST FLOOR (2) CHANGE OF USE FROM TRAY WASH AREA TO PACKAGING AREA (3) CONNECTION TO EXISTING FOUL AND STORM DRAINAGE WITHIN EXISTING SITE (4) RELOCATION OF (A) TRAY WASH FACILITY, IN NEW EXTENSION TO GROUND FLOOR (B) EXISTING GAS OIL AND SRM TANK AND ALL ASSOCIATED WORKS
(A) EXTENSION TO EXISTING PACKAGING BUILDING ON GROUND AND FIRST FLOOR, (B) RELOCATION OF TRAY WASH FACILITY, IN NEW EXTENSION TO GROUND FLOOR, (C) EXISTING TRAY WASH AREA TO BE CHANGED TO PACKAGING AREA, (D) RELOCATION OF EXISTING GAS OIL AND SRM TANK AND ALL ASSOCIATED WORKS, (E) PROVISION OF A TWO STOREY PLANT ROOM ATTACHED TO TRAY STORE, (F) BONE TRAILER YARD COVERED AND (G) CONNECTION TO EXISTING FOUL AND STORM DRAINAGE WITHIN EXISTING SITE
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE AND SEPTIC TANK SYSTEM WITH PERCOLATION AREA
DWELLING AND PERMISSION FOR (1) DEMOLITION OF EXISTING MICA DEFECTED DWELLING AND CONSTRUCTION OF NEW REPLACEMENT DWELLING AND (2) REPLACEMENT AND RELOCATION OF EXISTING SEPTIC TANK AND PERCOLATION AREA ALONG WITH ALL ASSOCIATED SITE WORKS
ALTERATIONS AND CONSTRUCTION OF EXTENSION TO EXISTING DWELLING HOUSE
CONSTRUCTION OF AN EXTENSION TO THE SIDE ELEVATION OF EXISTING DWELLING HOUSE AND RELOCATION OF EXISTING ACCESS ENTRANCE AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 95 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250602The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief