Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 216 decisions within 5 km, 6 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
CHANGE OF USE FROM RETAIL UNITS APPROVED UNDER PLANNING REFERENCE NO. 05/9032 TO CRECHE FACILITIES AT EXISTING COMMUNITY CENTRE
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO EXISTING PHARMACY UNIT
CONSTRUCTION OF A TWO STOREY EXTENSION CONSISTING OF A GROUND FLOOR EXTENSION TO EXISTING PHARMACY AND CRECHE ACCOMMODATION AT FIRST FLOOR LEVEL AT EXISTING COMMUNITY CENTRE
ERECTION OF 2 NUMBER AIRE DE SERVICE UNITS TO FACILITATE TOURING CARAVANS AND A PICNIC/SEATING AREA, INSTALLATION OF A WASTEWATER PUMPING STATION AND ASSOCIATED SITE DEVELOPMENT WORKS
(A) DEMOLITION OF TWO STOREY EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A NEW TWO STOREY EXTENSION, INTERNAL ALTERATIONS TO EXISTING FLOOR LAYOUT AND PROVISION FOR A ROOFED CAR PORT AND (B) DEVELOPMENT OF A PITCHED ROOF OVER EXISTING ATTACHED GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, CONNECTION TO PUBLIC MAIN SERVICES AND ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 216 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2250609The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.