Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 80 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE, SEPTIC TANK / WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS
(1) ERECTION OF A TEMPORARY 100M HIGH LATTICE TYPE METEOROLOGICAL MAST INCLUDING ANCILLARY WORKS FOR A PERIOD OF 5 YEARS, TO BE FIXED TO GROUND ANCHORS BY GUY WIRES AND INCLUDING INSTRUMENTS FOR MEASURING LOCAL CLIMATE CONDITIONS, SERVICES AND ASSOCIATED EQUIPMENT, (2) INFRA-RED LED AVIATION LIGHT TO BE FITTED NEAR THE TOP OF THE LATTICE SECTION OF THE PROPOSED METEOROLOGICAL MAST AND (3) BIRD FLIGHT DETERRENT MARKERS TO BE FITTED TO EACH GUY WIRE AT APPROXIMATELY 10M INTERVALS. AN APPROPRIATE ASSESSMENT AND NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) DEMOLITION OF PORCH TO THE EXISTING DERELICT DWELLING AND ADJACENT SHED, (2) RENOVATION AND ALTERATIONS TO EXISTING DERELICT DWELLING TOGETHER WITH THE CONVERSION OF AN ADJOINING AGRICULTURAL SHED TO PROVIDE NEW ACCOMMODATION ANCILLARY TO THE DWELLING INCLUDING CHANGES TO THE EXISTING ELEVATIONS, (3) CONSTRUCTION OF AN EXTENSION TO THE EXISTING DERELICT DWELLING, (4) CONSTRUCTION OF A RETAINING WALL ALONG THE SITE BOUNDARY TO THE REAR OF THE EXISTING DERELICT DWELLING AND (5) ALL ANCILLARY SITEWORKS REQUIRED TO FACILITATE THE DEVELOPMENT
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A NEW DOMESTIC STORE TO REPLACE EXISTING MICA DAMAGED DOMESTIC STORE
REPOSITIONING OF A SECTION OF THE EXISTING 38KV LINE KNOWN AS THE CARK-CULLIAGH 38KV LINE CONSISTING OF INSTALLATION OF 8 NEW STRUCTURES. THE AFFECTED LINE SECTION IS 700M
The brief summarizes the pattern across all 80 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250828The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief