Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 319 decisions within 5 km, 2 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DECOMMISSIONING OF EXISTING VEHICULAR ENTRANCE AND DEVELOPMENT OF A NEW VEHICULAR ENTRANCE TO EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS
DECOMMISSIONING OF EXISTING VEHICULAR ENTRANCE AND DEVELOPMENT OF A NEW VEHICULAR ENTRANCE TO EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A SPLIT-LEVEL DWELLING HOUSE, DETACHED DOMESTIC GARAGE, PROVISION OF AN ACCESS ROAD, EFFLUENT TREATMENT SYSTEM, LANDSCAPING AND ALL ASSOCIATED SITE WORKS
EXTENSION TO THE NORTH QUAY BY 59M AND THE CONSTRUCTION OF 4 NO. BREASTING DOLPHINS TO ASSIST STERN ON BERTHING AT THE END OF THE EXTENSION. THE PROPOSED WORKS ALSO INCLUDES CAPITAL DREDGING TO CREATE A NEW BERTHING POCKET ADJACENT TO THE QUAY EXTENSION. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIED THE APPLICATION
EXTENSION TO THE NORTH QUAY BY 59M AND THE CONSTRUCTION OF 4 NO. BREASTING DOLPHINS TO ASSIST STERN ON BERTHING AT THE END OF THE EXTENSION. THE PROPOSED WORKS ALSO INCLUDES CAPITAL DREDGING TO CREATE A NEW BERTHING POCKET ADJACENT TO THE QUAY EXTENSION. A NATURA IMPACT STATEMENT ACCOMPANIED THE APPLICATION
ERECTION OF A DOMESTIC GARAGE AND SHED WITH ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 319 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250855The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief