Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 310 decisions within 5 km, 9 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
ERECTION OF 3 NO. TOWN HOUSES, UPGRADING OF EXISTING CONNECTION TO PUBLIC SEWER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEMOLITION OF EXISTING ACCOMMODATION UNIT WITH ADJACENT STORAGE AND REPLACEMENT ACCOMMODATION UNIT AND ALL ASSOCIATED SITEWORKS
DEVELOPMENT AT THE PROPERTY FORMALLY KNOWN AS THE EAST PORT BAR. THE DEVELOPMENT WILL CONSIST OF: (1) CHANGE OF USE FROM PUBLIC HOUSE TO RESIDENTIAL UNITS AND DEMOLITIONS, ALTERATIONS, REFURBISHMENT AND EXTENSIONS TO PROVIDE 3 NO. ONE BEDROOM SELF-CONTAINED APARTMENT UNITS AT GROUND, FIRST AND SECOND FLOOR LEVELS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
RENOVATION OF EXISTING DWELLING INCORPORATING AN EXTENSION TO THE REAR OF THE DWELLING AND THE ADDITION OF A 1ST FLOOR TO FACILITATE 2 NO. ADDITIONAL BEDROOMS WITH ALL ASSOCIATED ELEVATIONAL CHANGES AND ALL ASSOCIATED SITE WORKS
(1) DEMOLITION OF EXISTING DERELICT SINGLE STOREY DWELLING HOUSE (2) CONSTRUCTION OF NEW TWO STOREY DWELLING HOUSE (3) UPGRADING OF EXISTING CONNECTION TO PUBLIC SEWER (4) ASSOCIATED SITE DEVELOPMENT WORKS
A CHANGE OF USE OF PART OF AN EXISTING BUILDING FROM DOMESTIC ACCOMMODATION TO USE AS OFFICE SPACE AND PERMISSION FOR (1) A CHANGE OF USE OF EXISTING DOMESTIC ACCOMMODATION TO USE AS OFFICE SPACE, (2) ELEVATIONAL CHANGES ASSOCIATED WITH THE CHANGE OF USE MENTIONED AT POINT ONE AND (3) ALL ASSOCIATED SITEWORKS INCLUDING THE FORMATION OF A LEVEL ACCESS TO THE MAIN ENTRANCE
The brief summarizes the pattern across all 310 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2250871The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief