Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 144 decisions within 5 km, 3 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DETACHED DOMESTIC GARAGE TO THE SIDE OF HOUSE WITH DRAINAGE CONNECTIONS TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS
WORKS TO EXISTING HOUSE INCLUDING (1) DEMOLITION AND REMOVAL OF EXISTING SINGLE-STOREY PORCH TO FRONT (SOUTH) OF HOUSE, DEMOLITION AND REMOVAL OF EXISTING SINGLE STOREY ANNEX TO SIDE (WEST) OF HOUSE (2) DEMOLITION AND REMOVAL OF SINGLE STOREY STONE OUTBUILDING TO WEST OF HOUSE AND DEMOLITION AND REMOVAL OF EXISTING TIMBER GARDEN SHED TO WEST OF HOUSE (3) PROVISION OF A TWO STOREY EXTENSION TO WEST SIDE OF EXISTING HOUSE (4) DECOMMISSIONING OF EXISTING SEPTIC TANK/PERCOLATION AREA AND PROVISION OF NEW EFFLUENT TREATMENT SYSTEM/PERCOLATION AREA (5) ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A SPLIT LEVEL DWELLING HOUSE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
REMOVAL OF DORMER STYLE PITCHED ROOF TO FIRST FLOOR OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A REMODELLED FIRST FLOOR DEVELOPMENT INCORPORATING A RAISED WALL PLATE LEVEL WITH PITCHED ROOF OVER, ENCLOSED ENTRANCE PORCH AT GROUND FLOOR LEVEL, PITCHED ROOF CAR PORT TO REAR ELEVATION AND ASSOCIATED SITE DEVELOPMENT WORKS
COMPLETION OF PARTIALLY CONSTRUCTED DWELLING & SEWERAGE TREATMENT PLANT, CONSTRUCTION OF DOMESTIC GARAGE AND RETAINING WALL INCORPORATING VEHICULAR BARRIER
EXTENSION AND RENOVATIONS TO EXISTING DWELLING HOUSE WITH ALTERATIONS TO ALL FACADES AND WITH CONNECTION TO EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 144 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2250905The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief