Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 273 decisions within 5 km, 6 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCTION OF A SLATTED SHED WITH EFFLUENT TANK, THE ROOFING OF AN EXISTING CATTLE CRUSH, THE PROVISION OF RAINWATER HARVESTING TANKS AND ROOF MOUNTED SOLAR PANELS AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A SLATTED SHED WITH EFFLUENT TANK, THE PROVISION OF RAINWATER HARVESTING TANKS FOR THE PURPOSES OF COLLECTING ROOF STORM DRAINAGE, ROOF-MOUNTED SOLAR PANELS, AND ALL ASSOCIATED SITE WORKS INCLUDING THE PROVISION OF A PREVIOUSLY APPROVED NEW ACCESS TO THE PUBLIC ROAD, APPROVED UNDER PLANNING REF: 19/51326 AND THE CLOSING OF AN EXISTING ACCESS GATE
CONSTRUCTION OF A SINGLE STOREY DWELLING, NEW ACCESS POINT TO ROAD, TREATMENT SYSTEM, PERCOLATION AREA, INCLUDING ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A SINGLE STOREY DWELLING, NEW ACCESS POINT TO ROAD, TREATMENT SYSTEM, PERCOLATION AREA, INCLUDING ALL ASSOCIATED SITE WORKS
ERECTION OF A MACHINERY STORAGE SHED AS AN EXTENSION TO EXISTING AGRICULTURAL BUILDING
(1) DEMOLITION OF EXISTING STORAGE SHEDS, (2) CONSTRUCTION OF A NEW TWO-STOREY BUILDING LOCATED BESIDE EXISTING CHANGING FACILITIES, WHICH SHALL INCORPORATE A GYM, TOILETS AND CHANGING ROOMS AT GROUND FLOOR LEVEL AND A MEETING ROOM AT FIRST FLOOR LEVEL AND (3) ALTERATIONS TO THE EXISTING CAR PARK AND ALL ANCILLARY SITE DEVELOPMENT WORKS INCLUDING CONNECTIONS TO EXISTING EFFLUENT TREATMENT SYSTEM AND RELEVANT SERVICES
The brief summarizes the pattern across all 273 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2251007The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief