Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 158 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLITION OF AN EXISTING DERELICT DWELLING AND ERECTION OF A DWELLING HOUSE, EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITEWORKS
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
DEVELOPMENT OF A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY FOR A PERIOD OF 10 YEARS CONSISTING OF UP TO 27 NO. BATTERY STORAGE MODULES (UP TO 14M LENGTH, 2.44M WIDE AND 2.9M HIGH) AND ANCILLARY EQUIPMENT INCLUDING UP TO 27 NO. TRANSFORMERS (UP TO 2.5M LENGTH, 2.5M WIDE AND 2.9M HIGH), 27 NO. POWER CONDITIONING UNIT BLOCK AREAS (UP TO 8.0M LENGTH, 1.5M WIDE AND 2.3M HIGH), 27 NO. SWITCHGEAR UNITS (UP TO 1.5M LENGTH, 1.5M WIDE AND 2.2M HIGH), SUBSTATION CONTAINER (UP TO 4.5M LENGTH, 4.5M WIDE AND 3.0M HIGH); INTERNAL PERMEABLE ACCESS ROAD JOINING THE FACILITY WITH THE EXISTING MEENADREEN WIND FARM ROAD NETWORK AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING FENCING, DRAINAGE AND UNDERGROUND ELECTRICAL CONNECTIONS, REQUIRED TO FACILITATE THE DEVELOPMENT AND USE OF EXISTING ACCESS ARRANGEMENTS. A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION
(1) ALTERATIONS, RENOVATIONS AND EXTENSION TO DWELLING HOUSE, (2) CHANGE OF USE OF ROOF SPACE TO HABITABLE SPACE, (3) OUTBUILDINGS AND (4) ALL ASSOCIATED SITE DEVELOPMENT WORKS
DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK WASTE WATER SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ENTRANCE PORCH TO THE FRONT OF EXISTING DWELLING HOUSE AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 158 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251111The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief