Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 276 decisions within 5 km, 1 exact-site or onsite candidate record, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLITION OF THE EXISTING FLAT ROOF STRUCTURE TO THE SIDE AND REAR (2) CONSTRUCTION OF A NEW EXTENSION TO THE REAR OF THE DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DWELLING WITH WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKS (GRANT OF OUTLINE PERMISSION, PLANNING REFERENCE 18/51730 REFERS)
ERECTION OF A DWELLING WITH WASTE WATER TREATMENT SYSTEM & PERCOLATION AREA AND PERMISSION FOR DECOMMISSIONING OF EXISTING SEPTIC TANK, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKS
(1) DEMOLITION OF EXISTING DWELLING AND DOMESTIC GARAGE DUE TO DEFECTIVE MICA BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF: 04/2999 (2) ERECTION OF A REPLACEMENT DWELLING OF SAME FOOTPRINT, TO BE CONNECTED TO EXISTING PREVIOUSLY APPROVED FOUL SYSTEM, TOGETHER WITH NEW SEPARATE DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
EXTENSION TO THE REAR OF DWELLING, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF NEW DWELLING HOUSE AND DOMESTIC GARAGE WITH EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
The brief summarizes the pattern across all 276 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251189The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief