Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 138 decisions within 5 km, 1 exact-site or onsite candidate record, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT WILL CONSISTS OF (1) CONSTRUCTION OF 3 WIND TURBINE GENERATORS AND ASSOCIATED HARDSTANDS AREAS WITHIN THE FOLLOWING PARAMETERS (A) A TOTAL TIP HEIGHT IN THE RANGE OF 145 METRES MINIMUM TO 150 METRES MAXIMUM (B) HUB HEIGHT IN THE RANGE OF 82 METRES MINIMUM TO 87 METRES MAXIMUM (C) ROTOR DIAMETER IN THE RANGE OF 121 METRES MINIMUM TO 126 METRES MAXIMUM (2) UPGRADING OF EXISTING SITE ACCESS TRACKS AND ROADS AND PROVISION OF NEW SITE ACCESS TRACK AND ROADS (3) WIDENING OF 3 NO. EXISTING SITE ENTRANCES AND PROVISION OF A NEW SITE ENTRANCE (4) WIDENING OF 4 NO. BENDS AND 1 NO. JUNCTION ALONG THE PUBLIC ROAD L2563 (5) CONSTRUCTION OF (A) A CONTROL BUILDING / SUBSTATION WITH A FENCED COMPOUND PREVIOUSLY PERMITTED UNDER PLANNING REFERENCE 14/50553 AND EXTENDED UNDER PLANNING APPLICATION REFERENCE 19/51227 (B) A NEW TEMPORARY SITE COMPOUND FOR USE DURING CONSTRUCTION (6) SITE DRAINAGE NETWORK (7) INSTALLATION OF INTERNAL WIND FARM UNDERGROUND POWER AND COMMUNICATIONS CABLING (7) ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. A ENVIRONMENTAL IMPACT ACCESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT ACCOMPANY THIS APPLICATION
CONSTRUCTION OF A CONTROL BUILDING/SUB STATION WITH FENCED COMPOUND AND ASSOCIATED SITE WORKS AT THE EXISTING WIND FARM SITE
ERECTION OF AN AGRICULTURAL SHED INCLUDING ALL ASSOCIATED SITE WORKS
ERECTION OF AN AGRICULTURAL SHED INCLUDING ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW DOMESTIC ENTRANCE TO ACCESS EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DOMESTIC GARAGE AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 138 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251393The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief