Applications tied to the site
Partial coverage18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 282 decisions within 5 km, 18 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A SINGLE STOREY GROUND FLOOR KITCHEN & DINING CONSERVATORY EXTENSION (43.6M2) TO THE REAR OF THE EXISTING B & B; ALONG WITH ASSOCIATED SITEWORKS AND CONNECTION TO EXISTING SERVICES
CHANGE OF USE OF A SECTION OF EXISTING 3 STOREY BUILDING (NO. 3) FROM GROUND FLOOR RETAIL USE AND 1ST AND 2ND FLOOR/ATTIC FLOOR OFFICE USE (PREVIOUSLY APPROVED UNDER PLANNING REF. 05/30852) TO NEW HOSTEL USE, ALONG WITH CHANGES TO INTERNAL LAYOUT AND CONNECTIONS TO EXISTING SERVICES
CHANGE OF USE OF A SECTION OF EXISTING 3 STOREY BUILDING (NO. 1) FROM GROUND FLOOR RETAIL USE AND 1ST & 2ND FLOOR/ATTIC FLOOR OFFICE USE (PREVIOUSLY APPROVED UNDER PLANNING REF 05/30852) TO NEW HOSTEL USE, ALONG WITH CHANGES TO INTERNAL LAYOUT AND CONNECTIONS TO EXISTING SERVICES
(1) DEMOLITION OF EXISTING OUTBUILDINGS IN THE REAR YARD (SOUTH-EAST CORNER) (2) CONSTRUCTION OF A NEW REPLACEMENT OUTBUILDING TO PROVIDE FOR A GARAGE AREA/ FUEL STORE AT GROUND FLOOR LEVEL WITH RESIDENTIAL AMENITY SPACES AT FIRST FLOOR LEVEL, ALL ANCILLARY TO THE EXISTING DWELLING HOUSE, TO INCLUDE ALL ASSOCIATED SITE-WORKS
DEMOLITION OF SINGLE STOREY ANNEX EXTENSION TO THE REAR, CONSTRUCTION OF A NEW EXTENSION TO THE REAR WITH ATTIC ACCOMMODATION, RENOVATIONS AND ALTERATIONS TO EXISTING BUNGALOW TO INCLUDE RAISING THE EXISTING RIDGE LINE AND ROOF ALONG THE REAR TO PROVIDE FOR ATTIC ACCOMMODATION WITH ALL ASSOCIATED SITE WORKS
(1) DEMOLITION OF EXISTING DILAPIDATED GROUND FLOOR & FIRST FLOOR ACCOMMODATION TO THE REAR OF THE MAIN HOTEL BUILDING NAMELY FUNCTION ROOM, TOILETS, KITCHEN, OUTBUILDINGS AND BEDROOMS (2) REFURBISHMENT OF EXISTING MAIN HOTEL BUILDING TO PROVIDE BAR & RESTAURANT AT GROUND FLOOR LEVEL AND 3 NO. REFURBISHED EN-SUITE BEDROOMS AT BOTH FIRST & SECOND FLOOR LEVELS; (3) CONSTRUCTION OF NEW TWO STOREY EXTENSION TO REAR OF THE HOTEL (1258 M2) WHICH WILL CONSIST OF (A) NEW RECEPTION AREA, BAR, WC FACILITIES, STAIRS & LIFT, KITCHEN, FUNCTION ROOM (WITH ASSOCIATED BAR & WC FACILITIES), CAFÉ, LAUNDRY & STORAGE AREAS ALL AT GROUND FLOOR LEVEL (B) 12 NO. NEW ENSUITE BEDROOMS AT FIRST FLOOR LEVEL WITH ASSOCIATED STORAGE ACCOMMODATION (4) REPLACEMENT OF EXISTING CANOPY & PORCH TO FRONT OF THE BUILDING WITH NEW TRADITIONAL STYLE CAST IRON FRAME GLAZED CANOPY WITH REINSTATED SIGNAGE (5) CONSTRUCTION OF 2 NO. DORMER WINDOWS AT 2ND FLOOR LEVEL TO FRONT OF MAIN HOTEL BUILDING, ALONG WITH PROVISION OF NEW CAR PARKING TO REAR, ASSOCIATED SITE WORKS AND CONNECTION TO EXISTING SERVICES
The brief summarizes the pattern across all 282 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251406The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief