Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 303 decisions within 5 km, 2 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF 454SQ METRES OF SOLAR PV PANELS ON ROOF OF EXISTING FARM BUILDING AND ALL ASSOCIATED SITE WORKS
MOBILE HOME ON SITE WITH CONNECTION TO EXISTING SEWAGE TREATMENT PLANT AND WATER SUPPLY FOR THE PURPOSE OF LIVING USE DURING PROPOSED MICA AFFECTED DWELLING HOUSE WORKS AND FOR THE DURATION OF THE WORKS ONLY AND PERMISSION FOR DEMOLITION OF EXISTING (DEFECTIVE/MICA) DWELLING HOUSE AND RECONSTRUCTION OF A NEW REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING SEWAGE TREATMENT PLANT
(1) VEHICULAR ENTRANCE AND (2) SEPTIC TANK SYSTEM AND ASSOCIATED DRAINAGE AND PERMISSION FOR DEMOLITION OF EXISTING DWELLING HOUSE CONSTRUCTED WITH DEFECTIVE CONCRETE BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) ERECTION OF A SINGLE STOREY BUNGALOW TYPE DWELLING, (2) DOMESTIC GARAGE/STORE, (3) DOMESTIC WASTE WATER SEPTIC TREATMENT SYSTEM AND PERCOLATION AREA AND (4) ALL OTHER ASSOCIATED SITE WORKS
(1) ERECTION OF A SINGLE TWO STOREY DETACHED DOMESTIC DWELLING & DETACHED GARAGE/STORE AND (2) INSTALLATION OF A WASTE WATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL OTHER ASSOCIATED SITE WORKS
ERECTION OF A SINGLE STOREY DETACHED DOMESTIC BUNGALOW TYPE DWELLING, DETACHED GARAGE/STORE, WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA & ALL OTHER ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 303 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251409The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief