Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,210 decisions within 5 km, 3 exact-site or onsite candidate records, and 66 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
66 structured nearby appeal records.
66 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A BOUNDARY WALL WITH IRON RAILING ON TOP AND INSTALLATION OF IRON GATES WITH ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A BOUNDARY WALL WITH IRON RAILING ON TOP AND ALL ASSOCIATED SITE WORKS
EMERGENCY ESCAPE DOOR TO THE EXTERNAL WALL OF UNIT 31 ON THE SOUTH ELEVATION ADJACENT TO THE SOUTH ENTRANCE OF THE SHOPPING CENTRE
(1) CHANGE OF USE FROM RESIDENTIAL DWELLING TO COMMUNITY DWELLING HOME FOR THE PROVISION OF RESIDENTIAL ACCOMMODATION AND CARE TO PEOPLE IN NEED OF CARE, (2) DEMOLITION OF EXISTING SHED AND (3) WORKS TO DWELLING INCLUDING: (A) CONSTRUCTION OF TWO-STOREY EXTENSION TO REAR PROVIDING FOR 6 NO. EN-SUITE BEDROOMS, (B) INTERNAL ALTERATIONS AT BASEMENT, GROUND AND FIRST FLOOR OF EXISTING BUILDING TO PROVIDE FOR LAUNDRY, STORAGE, PLANT, 5 NO. BEDROOMS (2 OF THESE BEDROOMS ARE EN-SUITE), LIVING ROOM, KITCHEN, DINING ROOM, AND BATHROOM. THE FACILITY WILL PROVIDE 11 NO. BEDROOMS IN TOTAL, (C) PROVISION OF WHEELCHAIR RAMP TO NEW SECONDARY ENTRANCE TO REAR OF BUILDING AND NEW ENTRANCE TO BASEMENT, (D) PROVISION OF NEW WINDOW ON SOUTHWESTERN FAÇADE OF EXISTING BUILDING, (E) ALTERATIONS TO REAR GARDEN TO PROVIDE 6 NO. CAR PARKING SPACES (INCLUSIVE OF 2 NO. DISABLED AND 2 NO. EV), (F) PROVISION OF BICYCLE PARKING TO REAR, (G) CONVERSION OF EXISTING GARAGE TO PROVIDE STAFF ACCOMMODATION COMPRISING BEDROOM, LIVING AREA, AND STAFF OFFICE, (H) PROVISION OF NEW WINDOWS THROUGHOUT AND 1 NO. DORMER WINDOW AT FIRST FLOOR AND (I) LANDSCAPING, BOUNDARY TREATMENTS, SUDS AND FOUL DRAINAGE AND ALL ANCILLARY WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
CONSTRUCTION OF NEW DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO THE PUBLIC SEWER
REVISION TO PREVIOUSLY APPROVED PERMISSION (PLAN. REF. NO. 13/80091, EXTENDED UNDER PLAN. REF. NO. 19/50059 REFERS) CONSISTING OF CONSTRUCTION OF A NEW BIOMASS HEATING CENTRE, AS PART OF THE NORTH-WEST REGIONAL SCIENCE PARK PROJECT. SITE C.056HA LOCATED WEST OF THE MAIN BUILDING OF LETTERKENNY IT CAMPUS. THE FOOTPRINT OF THE BUILDING REMAINS UNCHANGED. THE LOCATION HAS BEEN MODIFIED IN ORDER TO ALLOW FOR FUTURE EXTENSION TO THE LYIT CAMPUS BUILDING AND "GREENWAY" ROUTE. THE 83 SPACE CAR-PARKING AREA INCLUDED IN THE ORIGINAL GRANT OF PERMISSION HAS BEEN REMOVED
The brief summarizes the pattern across all 1,210 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251487The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief