Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 148 decisions within 5 km, 5 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF AN EXTENSION TO THE SIDE AND REAR OF THE EXISTING DWELLING HOUSE, NEW DETACHED DOMESTIC GARAGE TO THE SIDE OF THE DWELLING HOUSE AND ASSOCIATED SITE WORKS
EXTENSION, RENOVATION AND REFURBISHMENTS AT THE LAKEHOUSE HOTEL, CURRENTLY NOT OPERATING DUE TO ONGOING BUT STALLED WORKS OF REFURBISHMENT AND CONSISTING OF THE FOLLOWING: (1) EXTENSIONS TO FOOTPRINT OF THE MAIN HOTEL ADDING A GUEST BEDROOM FOR ACCESSIBLE USE TO THE EXISTING DETACHED SINGLE STOREY BEDROOM AND STORAGE BUILDING, (2) SMALL EXTENSIONS TO THE FOOTPRINT OF THE MAIN HOTEL BUILDING ALONG THE EAST SIDE AT GROUND FLOOR LEVEL TO PROVIDE FOR ENLARGED PLANT, STORAGE AND UTILITY SPACE AS WELL AS A NEW REAR ENTRANCE TO THE HOTEL ADDING APPROXIMATELY 75 SQ.M TO THE EXISTING OVERALL FLOOR AREA OF CIRCA 1,035 SQ. M, (3) ROOFING WORKS ASSOCIATED WITH THE EXTENSIONS LISTED AT NO. 1 & NO. 2 AND REROOFING WORK ASSOCIATED WITH THE CHANGE TO THE OVERALL ROOF PROFILE AND SHAPE INCLUDING THE RAISED LEVEL OF PARTS OF THE EXISTING ROOF AND THE REMOVAL OF THE GABLE FACING WEST, DORMER WINDOWS FACING WEST AND EAST WITH THE CONTINUATION OF THE NEW PITCHED ROOF PROFILE OVER THE EXISTING CENTRAL FLAT ROOF SECTION, (4) AMENDMENTS TO THE FENESTRATION AND WALL FINISHES RESULTING IN AMENDED ELEVATIONS, (5) DETACHED SINGLE STOREY STORAGE BUILDING AND (6) SITE BOUNDARY WALLS, GENERAL SITE WORKS AND DRAINAGE
DEMOLITION OF EXISTING CONSERVATORY AND ERECTION OF AN EXTENSION TO THE GABLE END OF EXISTING DWELLING HOUSE WITH ADDITIONAL ALTERATIONS TO ALL FACADES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A CAMPER VAN PARK CONSISTING OF THE FOLLOWING: (1) 10 NO. CAMPER VAN PARKING BAYS WITH ASSOCIATED SERVICES, (2) INTERNAL PATHWAYS, LANEWAYS AND ADDITIONAL PARKING AREAS, (3) PLAY AREA AND PICNIC BENCHES WITHIN GREEN AREAS, (4) SERVICE BUILDING CONTAINING SHOWERS / TOILETS / RECEPTION AREA ETC., (5) INSTALLATION OF NEW ON-SITE SEWAGE TREATMENT SYSTEM AND PERCOLATION AREA AND (6) PROPOSED NEW SIGNAGE BOARD AT ENTRANCE TO SITE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE, (2) AN ACCESSWAY THROUGH THE BERMS, ON LAND FORMERLY PART OF THE CAR PARK, (3) WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE. THE WATER TANK WILL BE SUPPLIED PRIMARILY FROM THE EXISTING WATER MAIN WITHIN THE COURSE AND FROM A FUTURE RAINWATER HARVESTING SYSTEM SUPPLIED FROM THE GUTTERS ON THE ROOF OF THE ADJOINING MAINTENANCE SHED. THIS SUPPLY WILL BE IN SUBSITUTION TO THE PRESENT SUPPLY FROM THE EXTRACTION SOURCE APPROVED IN 2004, AND (4) BOUNDARY FENCING ALONG DUNES TO THE NORTH-WESTERN TIP OF THE COURSE, IN AN AREA DESIGNATED IN THE COUNTY DONEGAL DEVELOPMENT PLAN 2018-2024 AS ESPECIALLY HIGH SCENIC AMENITY
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDMENTS TO THE GOLF COURSE EQUIPMENT SHED APPROVED UNDER PLANNING REFERENCE 18/50855 INCLUDING THE PROVISION OF ADDITIONAL FLOOR AREA OF 159 SQ.M AND FENESTRATION MODIFICATIONS (5) BOUNDARY FENCING ALONG DUNES TO THE NORTH-WESTERN TIP OF THE COURSE, IN AN AREA DESIGNATED IN THE COUNTY DONEGAL DEVELOPMENT PLAN 2018-2024 AS ESPECIALLY HIGH SCENIC AMENITY
The brief summarizes the pattern across all 148 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251615The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief