Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 555 decisions within 5 km, 2 exact-site or onsite candidate records, and 24 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
24 structured nearby appeal records.
24 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) CHANGE OF USE OF 201 METRES SQ. OF EXISTING WAREHOUSE TO OFFICE SPACE (2) ELEVATIONAL CHANGES INCLUDING NEW FEATURE ENTRANCE TO SIDE OF BUILDING AND NEW WINDOWS (3) PROVISION OF (A) NEW CANOPY TO FRONT OF BUILDING (B) NEW CARPARKING ARRANGEMENTS ON SITE (C) NEW SIGNAGE AND (4) ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF AN EXTENSION TO THE EXISTING FACTORY TO PROVIDE FOR ADDITIONAL CLEAN ROOM PRODUCTION/FACTORY AREAS, GENERAL STORAGE AND SERVICES BAYS WITH A TWO STORY ELEMENT CONTAINING ADMINISTRATION OFFICES, LABORATORIES, RECEPTION, TOILETS, PROVISION OF A NEW VEHICULAR ENTRANCE ONTO THE ESTATE ROAD AND PROVISION OF ADDITIONAL CAR PARKING AND A NEW ACCESS ROAD AROUND THE SIDE AND REAR OF THE NEW BUILDING, CONSTRUCTION OF A SINGLE STOREY ESB SUB-STATION, CONNECTION TO THE EXISTING FOUL AND STORM WATER DRAINAGE NETWORKS, PROVISION OF A STORM WATER ATTENUATION UNDERGROUND TANK AND CONNECTION TO THE EXISTING MAINS WATER SUPPLY NETWORK. THE DEVELOPMENT WILL BE PHASED WITH PHASE ONE BEING THE CONSTRUCTION OF THE STORAGE AND SERVICE BAY ELEMENT OF THE OVERALL BUILDING EXTENSION PROPOSAL AND STAGE TWO BEING THE COMPLETION OF THE FACTORY/PRODUCTION AREAS AND RECEPTION/OFFICES. ALL TO INCLUDE ALL ASSOCIATED BOUNDARY TREATMENTS AND SITE DEVELOPMENT WORKS AND CONNECTION TO ROADS AND SERVICES ALL AT THE (FORMER IDA) BUSINESS/ INDUSTRIAL PARK
(1) CONSTRUCTION OF A COMMERCIAL BUILDING CONSISTING OF OFFICES AND REPAIR/ MAINTENANCE WORKSHOP FOR VEHICLES IN CONNECTION WITH LOGISTICS/ HAULAGE BUSINESS, (2) REDUCTION OF LAND LEVEL BY REDUCING SOILS LEVEL AND CONSTRUCTION OF A RETAINING WALL, (3) CONNECTION TO WATERMAINS, PUBLIC SEWER AND STORMWATER SYSTEMS ADJACENT TO THE PROPOSED SITE, (4) UPGRADING OF EXISTING ENTRANCE ONTO THE EXISTING INDUSTRIAL ESTATE ROAD ADJACENT TO THE SITE TO ALLOW FOR HAULAGE VEHICLES, INCLUSIVE OF 2.4M HIGH ELECTRIC GATES, (5) LAYING OF HARDCORE STONE AREA FOR TRUCK PARKING AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A MEN'S SHED BUILDING, WHICH SHALL CONNECT TO ALL ADJOINING AND EXISTING SERVICES AND FOR ALL ANCILLARY SITE WORKS
CONSTRUCTION OF 58 NO. DWELLING HOUSES AND ALL ASSOCIATED SITE WORKS AND CONNECTION TO EXISTING FOUL SEWER. PREVIOUSLY APPROVED UNDER PLANNING REF 06/21430
CONSTRUCTION OF 58 NO. DWELLING HOUSES AND ALL ASSOCIATED SITE WORKS AND CONNECTION TO EXISTING FOUL SEWER. PREVIOUSLY APPROVED UNDER PLANNING REF 06/21430
The brief summarizes the pattern across all 555 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251660The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief