Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 262 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLITION OF EXISTING DWELLING HOUSE, (2) CONSTRUCTION OF A NEW REPLACEMENT SINGLE STOREY DWELLING HOUSE AND (3) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PROVISION OF A NEW EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
ERECTION OF A DOMESTIC EXTENSION TO THE FRONT OF EXISTING DWELLING HOUSE WITH ALTERATIONS TO THE SIDE FACADE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION TO THE REAR OF SCHOOL BUILDING COMPRISING OF 1 NO. RESOURCE ROOM WITH LOBBY AND ALTTERATIONS TO ACCOMMODATE SAME
(1) DECOMMISSIONING OF EXISTING SEPTIC TANK (2) INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM WITH POLISHING FILTER AND CONSTRUCTION ACCESS ROAD AND (3) ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A TWO STOREY DWELLING HOUSE, DOMESTIC GARAGE AND FOUL SEWER TREATMENT PLANT
DEMOLITION OF THE EXISTING DWELLING HOUSE AND SHEDS AND TO DECOMMISSION THE EXISTING SEPTIC TANK SYSTEM AND ERECTION OF A NEW REPLACEMENT DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 262 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251663The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief