Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 214 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE AND INSTALLATION OF A NEW SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF NEW DWELLING HOUSE AND DOMESTIC GARAGE, INSTALLATION OF A NEW PROPRIETARY SEWERAGE TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKS
SITE DEVELOPMENT WORKS INCLUDING (A) A VEHICULAR ENTRANCE, (B) INTERNAL ACCESS ROAD, (C) CONTAINERS ON SITE FOR STORAGE AND A MEETING ROOM, (D) POLYTUNNEL FOR GROWING PRODUCE, (E) 2M HIGH POST AND WIRE BOUNDARY FENCE TO THE PERIMETER OF THE SITE AND PERMISSION FOR ERECTION OF 5 NO. ADDITIONAL POLYTUNNELS, A TOILET FACILITY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
AS CONSTUCTED SUB-STRUCTURES AND CONCRETE SUBFLOOR BUILDING WORKS COMPLETED TO THE DWELLING HOUSE UNDER GRANT OF PERMISSION 06/20961 AND 11/20130 AND PERMISSION FOR (1) COMPLETION OF DWELLING HOUSE INCLUDING REVISIONS TO THE DWELLING HOUSE, (2) CONSTRUCTION OF A DOMESTIC GARAGE AND WASTEWATER TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEMOLITION OF DILAPADATED DWELLING HOUSE, CONSTRUCTION OF A NEW REPLACEMENT DWELLING HOUSE, DOMESTIC CAR SHED, WASTERWATER TREATMENT SYSTEM AND SECONDARY TREATMENT SYSTEM PLUS ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 214 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2251972The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief