Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 193 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A TIMBER FRAME DWELLING IN LIEU OF MOBILE HOME PREVIOUSLY APPROVED UNDER PLANNING REFERENCE 21/50637
(1) DEMOLITION OF EXISTING HABITABLE DWELLING & DECOMMISSIONING OF EXISTING SEPTIC TANK (2) CONSTRUCTION OF REPLACEMENT DWELLING & DOMESTIC GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM (3) ERECTION OF TEMPORARY MOBILE HOME INCLUDING ALL ASSOCIATED SITE WORKS
(1) DEMOLITION OF EXISTING DERELICT HOUSE AND DECOMMISSIONING AND REMOVAL OF EXISTING SEPTIC TANK (2) CONSTRUCTION OF A SINGLE STOREY REPLACEMENT DWELLING WITH ATTACHED GARAGE (3) INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM / PERCOLATION AREA (4) DEVELOPMENT OF A NEW ACCESS LANE TO SERVE THE HOUSE AND ALL ASSOCIATED SITE WORKS INCLUDING DEFINED BOUNDARY TREATMENT. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CHANGE THE EXISTING FRONT ROOFLIGHTS TO LARGER ROOFLIGHTS ON DWELLING HOUSE
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND POLISHING UNIT INCLUDING ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
EXTENSIONS TO EXISTING DWELLING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 193 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2252028The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief