Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

LECKENAGH , BURTONPORT , CO DONEGALOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

LECKENAGH , BURTONPORT , CO DONEGAL

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

5% of nearby decided applications were refused. The site check found 268 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.

Matched source
2350025
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

3 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

3 structured nearby appeal records.

3 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

268Nearby applications
3Site-linked candidates
5%Nearby refused
3Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

2350025

INSTALLATION OF 149.4KW PHOTOVOLTAIC (PV) PANEL SYSTEM ON EXISTING ROOF TOGETHER WITH NECESSARY ANCILLARY SITE WORKS AND SERVICES

Granted0.0 km15 June 2023
2350023

INSTALLATION OF 191.7KW PHOTOVOLTAIC (PV) PANEL SYSTEM ON EXISTING ROOF TOGETHER WITH NECESSARY ANCILLARY SITE WORKS AND SERVICES

Granted0.1 km15 June 2023
2560014

INSTALLATION OF AN ELECTRONIC COMMUNICATIONS INFRASTRUCTURE COMPRISING OF A 15-METRE HIGH LATTICE TOWER SUPPORTING 7 NO. RADIO-LINK DISHES, TOGETHER WITH EQUIPMENT CABINET, ENCLOSING FENCE AND GATE, FIBRE DUCTING AND CHAMBERS, FOUNDATION AND ALL ASSOCIATED ANCILLARY DEVELOPMENT. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED

Granted0.1 km06 March 2025
2450098

(1) ERECTION OF (A) 4 NO. DRY-GOODS STORAGE UNITS TOTALLING 1,100 SQ.M. AND (B) A 750 SQ.M. TWO STOREY OFFICE UNIT WITH SOLAR PANELS AND UNDERGROUND RAIN WATER STORAGE FACILITIES AND (2) CONNECTION TO MAIN SEWERAGE SYSTEM, PROPOSED ACCESS ROAD AND PARKING WITH ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

Granted0.2 km11 July 2024
2561270

CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS

Granted0.4 km11 September 2025
1951459

(1) DEMOLITION OF EXISTING BLOCKWORK WALLS AND CONSTUCTION OF A WASTEWATER PUMPING STATION (WWPS) WITH APPROXIMATELY 19M3 STORAGE, (2) CONSTRUCTION OF A WASTEWATER TREATMENT PLANT (WWTP) AND A NEW VEHICULAR ACCESS ON TO THE L-5983 ROAD. THE WWTP WILL PROVIDE PRIMARY TREATMENT FOR 300 POPULATION EQUIVALENT (PE), (3) INSTALLATION OF ASSOCIATED GRAVITY SEWERS, FLUSHING SYSTEM, RISING MAINS AND EXTENSION OF THE EXISTING SEWER WITH INCREASED DIAMETER AND (4) ASSOCIATED ANCILLARY WORKS TO THE WWPS AND WWTP ALONG THE R260 & L-5983 ROADS

Granted0.4 km10 September 2020

The brief summarizes the pattern across all 268 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required