Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 268 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
INSTALLATION OF 149.4KW PHOTOVOLTAIC (PV) PANEL SYSTEM ON EXISTING ROOF TOGETHER WITH NECESSARY ANCILLARY SITE WORKS AND SERVICES
INSTALLATION OF 191.7KW PHOTOVOLTAIC (PV) PANEL SYSTEM ON EXISTING ROOF TOGETHER WITH NECESSARY ANCILLARY SITE WORKS AND SERVICES
INSTALLATION OF AN ELECTRONIC COMMUNICATIONS INFRASTRUCTURE COMPRISING OF A 15-METRE HIGH LATTICE TOWER SUPPORTING 7 NO. RADIO-LINK DISHES, TOGETHER WITH EQUIPMENT CABINET, ENCLOSING FENCE AND GATE, FIBRE DUCTING AND CHAMBERS, FOUNDATION AND ALL ASSOCIATED ANCILLARY DEVELOPMENT. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED
(1) ERECTION OF (A) 4 NO. DRY-GOODS STORAGE UNITS TOTALLING 1,100 SQ.M. AND (B) A 750 SQ.M. TWO STOREY OFFICE UNIT WITH SOLAR PANELS AND UNDERGROUND RAIN WATER STORAGE FACILITIES AND (2) CONNECTION TO MAIN SEWERAGE SYSTEM, PROPOSED ACCESS ROAD AND PARKING WITH ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
(1) DEMOLITION OF EXISTING BLOCKWORK WALLS AND CONSTUCTION OF A WASTEWATER PUMPING STATION (WWPS) WITH APPROXIMATELY 19M3 STORAGE, (2) CONSTRUCTION OF A WASTEWATER TREATMENT PLANT (WWTP) AND A NEW VEHICULAR ACCESS ON TO THE L-5983 ROAD. THE WWTP WILL PROVIDE PRIMARY TREATMENT FOR 300 POPULATION EQUIVALENT (PE), (3) INSTALLATION OF ASSOCIATED GRAVITY SEWERS, FLUSHING SYSTEM, RISING MAINS AND EXTENSION OF THE EXISTING SEWER WITH INCREASED DIAMETER AND (4) ASSOCIATED ANCILLARY WORKS TO THE WWPS AND WWTP ALONG THE R260 & L-5983 ROADS
The brief summarizes the pattern across all 268 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2350025The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief