Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 421 decisions within 5 km, 8 exact-site or onsite candidate records, and 24 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
24 structured nearby appeal records.
24 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
2 NO. CONTAINERS AND PERMISSION FOR ERECTION OF 2 NO. DWELLING HOUSES WITH CONNECTION TO PUBLIC SEWER INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF MINOR EXTENSIONS TO THE BEDROOMS AND ALTERATIONS TO FRONT FACADE INCLUDING ALL OTHER ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF A GENERALLY SINGLE STOREY WITH TWO STOREY OVER CENTRAL CORE, EXTENSION TO THE LAKEHOUSE NURSING HOME, PORTNABLAGH CONSISTING OF 23 NO. SINGLE BEDROOMS WITH ENSUITES, ASSOCIATED DAYSPACE, ASSOCIATED ANCILLARY ROOMS, NEW KITCHEN AND LAUNDRY WING, NEW MAIN ENTRANCE, STAFF OFFICES, STAFF CHANGING, REST AND WELFARE ON FIRST FLOOR, LANDSCAPED INTERNAL COURTYARD, LANDSCAPED EXTERNAL SPACE, BIN STORE AND PARKING (2) INSTALLATION OF (A) A NEW PUMPING STATION TO FACILITATE A DIVERSION OF THE EXISTING FOUL SEWER (B) A NEW WASTE WATER TREATMENT PLANT TO TREAT THE FOUL DRAINAGE FROM THE PROPOSED EXTENSION. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) OMISSION OF THE LOWER GROUND FLOOR (BASEMENT) TO UNIT NO. 2 AND UNIT NO. 3, (2) COVERED LINK BETWEEN UNITS NO. 3 AND UNIT NO. 4 (3) UNIT NO. 5 AND UNIT NO. 6 AS DETACHED UNITS - PREVIOUSLY PERMITTED AS ONE BLOCK WITH ASSOCIATED ELEVATION CHANGES AND PERMISSION FOR (1) NEW BALCONY AREAS/EXTERNAL STORES TO REAR OF UNITS 1-4 AND PROVISION OF ELEVATIONAL CHANGES TO UNITS 1-4, (2) CONSTRUCTION OF A NEW BALCONY AREA / EXTERNAL STORES TO REAR OF UNITS 5 & 6 AND PROVISION OF ELEVATIONAL CHANGES TO UNITS 5 & 6, (3) SITE BOUNDARY WALLS AND FENCING, PROVISION OF HARD & SOFT LANDSCAPING TO ENTIRE SITE, PROVISION OF CONNECTIONS TO ALL SITE SERVICES PREVIOUSLY APPROVED AND INSTALLED UNDER PLANNING REF: 07/60667 & 09/30170 AND FOR ALL ASSOCIATED SITE-WORKS
CHANGE OF HOUSE TYPE TO THAT PREVIOUSLY APPROVED UNDER PLANNING REF. 19/51537
ERECTION OF A DWELLING HOUSE WITH CONNECTION TO PUBLIC SEWER
The brief summarizes the pattern across all 421 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2350249The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief