Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 285 decisions within 5 km, 2 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A SHED WITHIN EXISTING YARD AREA FOR STORAGE AND LIGHT REPAIR WORKS IN CONNECTION WITH EXISTING CONCRETE MANUFACTURING FACILITY BUSINESS AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) VEHICULAR ENTRANCE AND (2) SEPTIC TANK SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(A) RETENTION AND COMPLETION OF A YARD FOR PARKING AND STORAGE OF VEHICLES, WORKS TO INCLUDE THE CONSTRUCTION OF A BOUNDARY WALL, DRAINAGE AND ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS AND (B) CONSTRUCTION OF AN EXTENSION TO EXISTING CONCRETE MANUFACTURING FACILITY AND ASSOCIATED SITE DEVELOPMENT WORKS
(A) RETENTION & COMPLETION OF A YARD FOR PARKING AND STORAGE OF VEHICLES, WORKS TO INCLUDE THE CONSTRUCTION OF A BOUNDARY WALL, DRAINAGE AND ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS AND (B) CONSTRUCTION OF AN EXTENSION TO EXISTING CONCRETE MANUFACTURING FACILITY AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) REMOVAL OF EXISTING SAW SHED STRUCTURE, (2) RAISING THE ROOF OF EXISTING WORKSHOP UNIT AND FITTING NEW CLADDING TO FRONT, SIDES AND ROOF, (3) CONSTRUCTION OF AN EXTENSION TO NORTH EAST CORNER OF EXISTING WORKSHOP UNIT AND NEW ENTRANCE PORCH TO FRONT AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 285 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2350445The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief