Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 294 decisions within 5 km, 3 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
ALTERATIONS AND CHANGE OF USE OF PART OF THE FRONT OF THE EXISTING SHOP TO PROVIDE A COFFEE DOCK FOR SALE OF FOOD AND BEVERAGES, WITH INTERNAL AND EXTERNAL SERVERY HATCHES AND PROVISION OF INTERNAL AND EXTERNAL SEATING TO INCLUDE PROVISION OF OPENINGS IN THE FRONT ELEVATION AND ELEVATION CHANGES
DEMOLITION OF EXISTING SHED (MACHINE SHOP), CONSTRUCTION OF A NEW BUILDING, STORAGE AREA ASSOCIATED WITH EXISTING RETAIL OUTLET AND NEW MACHINE SHOP ASSOCIATED WITH EXISTING BOAT YARD, CONNECTION TO EXISTING ON-SITE SERVICES WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A NEW PLANT AND SUPPLIES STORAGE BUILDING FOR THE DEPARTMENT OF AGRICULTURE, FOOD AND THE MARINE
DEMOLITION OF A SECTION OF THE EXISTING SEA WALL IN COMBINATION WITH THE CONSTRUCTION OF A NEW ROCK ARMOUR REVETMENT AND A NEW BOUNDARY FENCE ON THE SOUTH-EAST OF THE EXISTING BOAT YARD FACILITY
(1) CONSTRUCTION OF A NEW 2-STOREY OFFICE BUILDING WITH ANCILLARY FACILITIES, ASSOCIATED SITE WORKS AND NEW PHOTOVOLTAIC PANEL INSTALLATION ON THE ROOF AND (2) ERECTION OF A NEW SCULPTURAL ART PIECE ON SITE
EXTENSION TO AN EXISTING LIFT AT THE REAR OF BUILDING (WHICH CURRENTLY SERVES UP TO LEVEL 2) TO FACILITATE ACCESS TO LEVEL 3, COMPLETE WITH NEW CONNECTION
The brief summarizes the pattern across all 294 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2350482The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief