Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 217 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A NEW DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
EXISTING SUNROOM
(1) PARTIAL DEMOLITION OF EXISTING PUBLIC BAR TO FACILITATE NEW VEHICULAR ENTRANCE IN BLOCK A (2) DEMOLITION OF EXISTING BACK RETURNS AND CONSTRUCTION OF NEW BACK RETURNS IN BLOCK A (3) DECOMMISSIONING OF EXISTING SEPTIC TANK & REMOVAL OF SAME (4) DEMOLITION OF THE SHED BUILDING (5) REFURBISHMENT OF EXISTING 2 BEDROOM DWELLING HOUSE IN BLOCK A (6) REFURBISHMENT OF EXISTING 3 BEDROOM DWELLING HOUSE IN BLOCK A (7) REFURBISHMENT OF EXISTING BAR IN BLOCK A (8) CONVERSION OF THE EXISTING OUTHOUSES INTO TWO NO. 2 BEDROOM DWELLING HOUSES FOR LETTING PURPOSES IN BLOCK B (9) CONVERSION OF EXISTING OUTHOUSES INTO 1 NO. 4 BEDROOM DWELLING HOUSE FOR LETTING PURPOSES IN BLOCK B (10) INSTALLATION OF A SEWAGE TREATMENT PLANT AND ALL ANCILLARY SITE WORKS
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE
CONSTRUCTION OF A DWELLING WITH ON-SITE SEWAGE TREATMENT AND DETACHED GARAGE. A NATURA IMPACT ASSSESSMENT (NIS) IS INCLUDED WITH THIS APPLICATION
ERECTION OF AN AGRICULTURAL MACHINERY STORAGE SHED WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 217 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2350530The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief