Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 254 decisions within 5 km, 4 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE MICA BLOCKWORK AND ERECTION OF A REPLACEMENT DWELLING WITH CONNECTION TO EXISTING SEWAGE SYSTEM AND SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING SUNROOM DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS, (2) RECONSTRUCTION OF SAID SUNROOM OF REVISED DESIGN, (3) ELEVATIONAL AMENDMENTS TO EXISTING DORMER BUNGALOW DWELLING AND (4) RELEVANT ASSOCIATED REPLACEMENT WORKS WILL BE CONNECTED TO THE EXISTING SITE SERVICES
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA
TEMPORARY SINGLE STATIC MOBILE-HOME STRUCTURE, CONNECTION TO EXISTING DOMESTIC WASTEWATER TREATMENT SYSTEM AND OTHER EXISTING SITE SERVICES INCLUDING ALL OTHER ASSOCIATED SITE WORKS
(1) DEMOLITION OF EXISTING MICA DEFECTIVE DWELLING, (2) ERECTION OF A REPLACEMENT TWO STOREY DWELLING HOUSE, CONNECTION TO EXISTING DOMESTIC WASTE WATER TREATMENT SYSTEM, OTHER EXISTING SITE SERVICES AND ALL OTHER ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA
The brief summarizes the pattern across all 254 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2350548The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief