Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 281 decisions within 5 km, 6 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) EXTENSION TO EXISTING FUNCTION ROOM, (2) EXISTING SIGNAGE TO THE FRONT AND SIDE ELEVATIONS AND (3) CHANGES TO THE ALLINGHAM ARMS HOTEL AS CONSTRUCTED INCLUDING ALL ANCILLARY SITE WORKS
INSTALLATION OF HIGH-POWER ELECTRIC VEHICLE CHARGING POINTS AND ASSOCIATED INFRASTRUCTURE CONSISTING OF THE FOLLOWING: (1) INSTALLATION OF 8 NO. ELECTRIC VEHICLE CHARGING BAYS WITH 8 NO. TESLA ILLUMINATED CHARGING UNITS AND ASSOCIATED SIGNAGE, (2) INSTALLATION OF PROPOSED TESLA SUPERCHARGER POWER CABINET EQUIPMENT, (3) INSTALLATION OF PROPOSED MODULAR SUBSTATION, (4) ERECTION OF ASSOCIATED EV SIGNAGE, (5) RELOCATION OF AN EXISTING LIGHTING POLE AND (6) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING SURFACING, LIGHTING AND LINE MARKING
CONSTRUCTION OF AN EXTENSION TO EXISTING DWELLING
(1) REMOVAL OF EXISTING CANOPY OVER MAIN HOTEL ENTRANCE AND ERECTION OF REPLACEMENT CANOPY WITH SIGNAGE OVER (2) ERECTION OF SEMI-ENCLOSED EXTERNAL SEATING AREA, WITH TIMBER AND GLAZED CANOPY OVER, TO SIDE OF EXISTING HOTEL CAFÉ BAR AND ALL ASSOCIATED SITE WORKS
(1) PROVISION OF A SINGLE STOREY DETACHED CAFE/COFFEE KIOSK(9.76M2) (2) REPLACEMENT OF 2NO EXISTING SIGNAGE UNITS AT ENTRANCE TO HOTEL WITH 2NO MONOLITH SIGNS AND ALL ASSOCIATED SITE WORKS
(1) 18.92M2 REAR EXTENSION AT GROUND FLOOR TO ACCOMMODATE FIRE ESCAPE STAIRWELL, INCREASED AREA OF EXISTING TOILET FACILITIES AND STAFF LOCKER ROOMS; (2) 28.37M2 REAR EXTENSION AT FIRST FLOOR TO ACCOMMODATE FIRE ESCAPE STAIRWELL AND 1 NO. BEDROOM; (3) 13.89M2 SIDE EXTENSION AT GROUND FLOOR AND 18.69M2 SIDE EXTENSION AT FIRST FLOOR TO ACCOMMODATE FIRE ESCAPE STAIRWELL; (4) 57.07M2 INFILL EXTENSION AT GROUND FLOOR TO ACCOMMODATE ENTRANCE LOBBY, COMMUNAL AREA AND INFORMATION DESK; (5) 57.07M2 INFILL EXTENSION AT FIRST FLOOR TO ACCOMMODATE FIRE ESCAPE CORRIDOR AND 2 NO. BEDROOMS; (6) MODIFICATIONS TO FENESTRATION, INCLUDING ADDITIONAL, REPOSITIONING AND REMOVAL; AND (7) PERMISSION FOR REPLACEMENT OF EXISTING TARPAULIN COVERING TO CANOPY OVER ENTRANCE TO RESTAURANT WITH FLAT/PITCHED ROOF AND ALL ASSOCIATED WORKS
The brief summarizes the pattern across all 281 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2350558The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief