Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,211 decisions within 5 km, 2 exact-site or onsite candidate records, and 64 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
64 structured nearby appeal records.
64 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLITION/REMOVAL OF THE EXISTING SCHOOL AND REMOVAL OF TEMPORARY BUILDINGS, (2) CONSTRUCTION OF A NEW PERMANENT 2-STOREY POST PRIMARY SCHOOL BUILDING FOR ERRIGAL COLLEGE (9,000 SQM NEW GROSS FLOOR AREA) WITH ASSOCIATED EXTERNAL SIGNAGE. THE CONSTITUENT ELEMENTS OF THE NEW SCHOOL COMPRISE: 27 GENERAL CLASSROOMS, 19 SPECIALIST CLASSROOMS, 2 SPECIAL NEEDS CLASSROOMS WITHIN A SPECIAL EDUCATIONAL NEEDS SUITE, MP HALL AND ASSOCIATED PE ANCILLARY ACCOMMODATION, STAFFROOM, ADMINISTRATION ROOMS, TOILETS, STORES AND GENERAL ANCILLARY ACCOMMODATION AND A DOUBLE HEIGHT GENERAL PURPOSE ROOM WITH ASSOCIATED KITCHEN AND STORE, (3) EXTERNAL COVERED AREA AND EXTERNAL CONSTRUCTION STUDIES STORE, (4) SITE DEVELOPMENT WORKS INCLUDING REVISIONS TO VEHICULAR/PEDESTRIAN AND CYCLE ACCESS ARRANGEMENTS TO PROVIDE CAR AND BUS SET-DOWN SPACES INCLUDING 63 NO. STANDARD CAR PARKING SPACES FOR STAFF/VISITORS, 3 NO. UNIVERSALLY ACCESSIBLE PARKING SPACES, AREA FOR 90 NO. CYCLE PARKING SPACES AND VEHICULAR ENTRANCE/EXIT ONTO KILMACRENNAN ROAD, (5) 5 NO. HARD COURTS AND (6) A ROOF MOUNTED PHOTOVOLTAIC ARRAY. THE PROPOSED DEVELOPMENT ALSO INCLUDES HARD AND SOFT LANDSCAPING, GRASSED PLAY SPACE, OUTER ACITIVITY COURTYARDS, SEN GARDEN/PLAY SPACE, EXTERNAL GRASS PITCHES, ASSOCIATED SITE DEVELOPMENT AND SERVICE INFRASTRUCTURE WORKS
CONSTRUCTION OF AN EXTENSION TO CONNECT AND CHANGE THE USE OF EXISTING DETACHED GARAGE TO FORM PART OF THE RESIDENTIAL DWELLING HOUSE, WORKS TO INCLUDE AMENDMENTS TO WINDOW OPENINGS AND ALL ANCILLARY SITE AND ASSOCIATED DEVELOPMENTS WORKS
(1) EXTENSION TO THE REAR OF DWELLING, (2) SEPARATE DOMESTIC WORKSHOP LINKED TO THE NEW EXTENSION VIA A SHED, (3) WINDOWS ON THE EAST AND NORTH FACING FACADES, (4) BOUNDARY WALLS TO THE NORTH AND WEST SIDE OF SITE AND (5) ALL ASSOCIATED WORKS AND SITE WORKS
CHANGE OF USE OF A DWELLING HOUSE TO HOSTEL RESIDENTIAL ACCOMMODATION
(1) CONSTRUCTION OF (A) A SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING CDM HUB BUILDING (B) ADDITIONAL CAR PARKING SPACES (C) NEW STEPS AND RAMP ACCESS FROM LOWER CAR PARK (D) EXTERNAL BIN STORE (2) DEMOLITION OF AN EXISTING OUTBUILDING (3) RELOCATION OF EXISTING OIL TANK AND ALL ASSOCIATED WORKS AND SITE WORKS INCLUDING CONNECTION TO EXISTING FOUL AND STORM DRAINAGE
CONSTRUCTION OF A PART TWO STOREY, PART THREE STOREY, COMMUNITY NURSING UNIT/RESIDENTIAL CARE UNIT (9,400SQM TOTAL GROSS FLOOR AREA). THE BUILDING COMPRISES OF 110 BEDS FOR A MIX OF LONG STAY, SHORT STAY/REHABILITATION AND DEMENTIA USES WITH ASSOCIATED RESIDENT ACCOMMODATION INCLUDING DINING ROOMS, KITCHENETTES, RESIDENT AREAS WITH FAMILY OVERNIGHT ROOM, VISITOR'S ROOM, TREATMENT ROOMS, HAIRDRESSER'S SALON; REHABILITATION ROOMS; INTERNAL COURTYARD AND TERRACE SPACES; BACK OF HOUSE AREAS INCLUDING KITCHEN AND LAUNDRY ROOMS, STAFF ACCOMMODATION AND ANCILLARY OFFICES AND NEW ENTRANCE FROM KILMACRENNAN ROAD; HARD AND SOFT LANDSCAPING; SERVICE YARD (THE TOTAL GROSS FLOOR AREA OF SERVICE BUILDINGS IS 74SQM AND INCLUDES WASTE STORAGE AREA, STAFF AREAS AND ESB SWITCH ROOM AND SUB STATION); AND ALL ASSOCIATED SITE AND DEVELOPMENT WORKS
The brief summarizes the pattern across all 1,211 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2350561The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief