Executive snapshot
10% of nearby decided applications were refused. The site check found 113 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE CONSISTING OF THE DEMOLITION OF A SINGLE STOREY REAR EXTENSION, THE CONSTRUCTION OF A TWO STOREY REAR EXTENSION WITH MINOR ELEVATIONAL CHANGES AND RENOVATIONS TO EXISTING DWELLING HOUSE AND IMPROVEMENTS TO PERCOLATION AREA
CONSTRUCTION OF A DWELLING HOUSE WITH ATTACHED GARAGE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED WORKS
COMPLETION OF AN UNFINISHED DEVELOPMENT CONSISTING OF (A) REMOVAL OF 7 EXISTING FOOTINGS ON SITE, (B) COMPLETION OF 3 DETACHED FOOTINGS ON SITE NO'S 6,7 AND 9, (C) CONSTRUCTION OF 4 SINGLE STOREY DWELLINGS, (D) CONSTRUCTION OF 8 SEMI DETACHED DWELLINGS AND (E) CONSTRUCTION OF 15 DETACHED DWELLINGS AND COMPLETION OF ALL EXISTING UNFINISHED DRIVEWAYS, FOOTPATHS, LAMPSTANDS, SEWER PIPEWORK, SURFACE WATER PIPEWORK AND THE MAINS PIPEWORK AND ALL OTHER ANCILLARY WORK INCLUDING LANDSCAPING OF OPEN SPACES
COMPLETION OF AN UNFINISHED DEVELOPMENT CONSISTING OF (A) REMOVAL OF 7 EXISTING FOOTINGS ON SITE, (B) COMPLETION OF 3 DETACHED FOOTINGS, (C) CONSTRUCTION OF 4 SINGLE STOREY DWELLINGS, (D) CONSTRUCTION OF 8 SEMI DETACHED DWELLINGS AND (E) CONSTRUCTION OF 15 DETACHED DWELLINGS AND COMPLETION OF ALL EXISTING UNFINISHED DRIVEWAYS, FOOTPATHS, LAMPSTANDS, SEWER PIPEWORK, SURFACE WATER PIPEWORK AND THE MAINS PIPEWORK AND ALL OTHER ANCILLARY WORK INCLUDING LANDSCAPING OF OPEN SPACES
(1) REMOVAL OF UNAUTHORISED WALL AND CONSTRUCTION OF AN EXTENSION TO THE SIDE ELEVATION OF EXISTING PREMISES KNOWN AS 'THE ALT BAR', AND (2) RETENTION OF SMOKING AREA
(A) RETENTION OF EXISTING CONCRETE RETAINING WALL STRUCTURE AND TIMBER FENCE, (B) FILLING IN OF EXISTING EXCAVATED LANDS TO PROVIDE FOR A YARD AND (C) ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 113 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2350776The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief