Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 327 decisions within 5 km, 3 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
EXTENSION OF THE PREVIOUSLY APPROVED CARPARKING AREA GRANTED UNDER PLANNING REF: 21/52054. THE EXTENDED CARPARK WILL INCLUDE ADDITIONAL CAR PARKING SPACES AND RELOCATED EV CHARGING POINTS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
DEVELOPMENT OF AN EXTENSION TO THE EXISTING CARPARKING AREA COMPRISING OF ADDITIONAL CAR PARKING SPACES AND A COACH PARKING AREA, TOGETHER WITH ALL ASSOCIATED SITE WORKS INCLUSIVE OF EV CHARGING POINTS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF AN UNDERGROUND GOLF BUGGY STORAGE BUNKER
DEMOLITION OF EXISTING DWELLING HOUSE AND ERECTION OF A REPLACEMENT DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED WORKS
(1) DEMOLITION OF A DERELICT STONE BUILDING (2) CONSTRUCTION OF A 1.5 STOREY DWELLING WITH INTEGRATED DOMESTIC GARAGE WITH CONNECTION TO A NEW WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED WORKS INCLUDING UPGRADING OF EXISTING ACCESS LANE
CONSTRUCTION OF AN AGRICULTURAL SHED WITH SILAGE PIT TOGETHER WITH ASSOCIATED WORKS
The brief summarizes the pattern across all 327 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2350796The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief