Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 291 decisions within 5 km, 1 exact-site or onsite candidate record, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLITION OF EXISTING STOREY AND A HALF DWELLING HOUSE AND THE CONSTRUCTION OF A NEW REPLACEMENT STOREY AND HALF DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEVELOPMENT CONSISTING OF THE CONSTRUCTION OF A VEHICULAR ENTRANCE FROM THE PUBLIC ROAD L-6995-1 TO GAIN VEHICULAR ACCESS TO AN EXISTING FORESTRY FOR THE PURPOSE OF THINNING OF THE EXISTING TREES AND GENERAL MAINTENANCE OF THE FOREST
CONSTRUCTION OF A VEHICULAR ENTRANCE FROM THE PUBLIC ROAD L-6995-1 TO GAIN VEHICULAR ACCESS TO AN EXISTING FORESTRY FOR THE PURPOSE OF THINNING OF THE EXISTING TREES AND GENERAL MAINTENANCE OF THE FOREST
(1) DEMOLITION OF EXISTING STORAGE SHEDS, (2) CONSTRUCTION OF A NEW TWO-STOREY BUILDING LOCATED BESIDE EXISTING CHANGING FACILITIES, WHICH SHALL INCORPORATE A GYM, TOILETS AND CHANGING ROOMS AT GROUND FLOOR LEVEL AND A MEETING ROOM AT FIRST FLOOR LEVEL AND (3) ALTERATIONS TO THE EXISTING CAR PARK AND ALL ANCILLARY SITE DEVELOPMENT WORKS INCLUDING CONNECTIONS TO EXISTING EFFLUENT TREATMENT SYSTEM AND RELEVANT SERVICES
CONSTRUCTION OF A PEDESTRIAN WALKWAY WITH LOW-LEVEL LIGHTING TO THE PERIMETER OF EXISTING FOOTBALL FIELDS AND ALL ANCILLARY SITE DEVELOPMENT WORKS
ERECTION OF (1) EXTENSIONS TO THE FRONT, REAR AND SIDE OF AN EXISTING DWELLING HOUSE (2) A NEW WORKSHOP AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 291 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2350823The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief