Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 371 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) ERECTION OF AN EXTENSION TO EXISTING DWELLING HOUSE, (B) ERECTION OF DOMESTIC GARAGE AND (C) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF NEW TERTIARY TREATMENT SYSTEM AND INFILTRATION/TREATMENT AREA
(1) PLACING OF A MOBILE HOME AS A TEMPORARY STRUCTURE FOR THE DURATION OF DEVELOPMENT WORKS AND PERMISSION FOR (2) DEMOLITION OF EXISTING DETACHED STOREY AND HALF (DEFECTIVE/MICA) DWELLING HOUSE, (3) RECONSTRUCTION OF A NEW REPLACEMENT STOREY AND HALF DWELLING HOUSE AND CONNECTION TO EXISTING SEWAGE TREATMENT SYSTEM ON SITE AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A SINGLE STOREY SUN-ROOM EXTENSION TO DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING PARTIALLY DEMOLISHED DWELLING HOUSE & OUTBUILDINGS, (2) CONSTRUCTION OF A DWELLING HOUSE & DOMESTIC GARAGE, (3) CONSTRUCTION OF MECHANICAL TREATMENT SYSTEM/SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
ERECTION OF NEW DWELLING HOUSE, PROPRIETARY SEWAGE TREATMENT SYSTEM & PERCOLATION AREA AND ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE, PROPRIETARY SEWAGE TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 371 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351143The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief