Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 44 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF TWO WIND TURBINES COMPRISING A STEEL TOWER, NACELLES AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT ALSO INCLUDES EXTERNAL WIND TURBINE TRANSFORMERS; TURBINE HARDSTANDS; NEW ACCESS TRACKS, UPGRADE OF EXISTING TRACKS, NEW SITE ENTRANCE; DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCESS TRACKS; UNDERGROUND ELECTRICAL CABLES; AND ALL ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKS
CONSTRUCTION OF TWO WIND TURBINES COMPRISING A STEEL TOWER, NACELLES AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT ALSO INCLUDES EXTERNAL WIND TURBINE TRANSFORMERS; TURBINE HARDSTANDS; NEW ACCESS TRACKS, UPGRADE OF EXISTING TRACKS, NEW SITE ENTRANCE; DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCESS TRACKS; UNDERGROUND ELECTRICAL CABLES; AND ALL ANCILLARY DEVELOPMEMENT AND ASSOCIATED SITE WORKS
CONSTRUCTION AND OPERATION OF 2 NO. WIND TURBINES COMPRISING OF A STEEL TOWER, NACELLES, AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT INCLUDES: EXTERNAL WIND TURBINE TRANSFORMERS, TURBINE HARDSTANDS, NEW ACCESS TRACKS, UPGRADING OF EXISTING TRACKS, NEW SITE ENTRANCE, DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCESS TRACKS, UNDERGROUND ELECTRICAL CABLES, AND ALL ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKS
ALTERATION OF PREVIOUSLY GRANTED DWELLING UNDER PLANNING REF:16/50951
(1) DOMESTIC SHED (208.2M2) WITH COVERED CLOTHES DRYING/STORAGE AREA (42.9M2) TO THE REAR OF EXISTING DWELLING AND (2) AGRICULTURAL SHED (486.5M2)
ERECTION OF DWELLING WITH EFFLUENT TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 44 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351218The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief