Executive snapshot
7% of nearby decided applications were refused. The site check found 244 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) CONSTRUCTION OF ONE ENERCON E138 WIND TURBINE ON A 99M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 169M, (B) THE CONSTRUCTION OF WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA, (C) PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE, (D) CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS
CONSTRUCTION OF ONE WIND TURBINE COMPRISING TOWER, NACELLE, AND ROTOR BLADES WITH A TOWER HEIGHT OF UP TO 67M METRES, A ROTOR BLADE DIAMETER OF UP TO 115.7 METRES AND AN OVERALL TIP HEIGHT OF UP TO 124.5 METRES. THE PROPOSED DEVELOPMENT INCLUDES A WIND TURBINE, TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA, SITE ACCESS TRACK, ASSOCIATED DRAINAGE WORKS, UNDERGROUND ELECTRICAL CABLE, 20kV ESB/IPP SUBSTATION AND ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF (A) ONE ENERCON E138 WIND TURBINE ON AN 81M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 149.38 (B) THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA (C) AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE (2) DEVELOPMENT OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE (3) ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS
REVISED RIDGE HEIGHT AND FLOOR LEVEL, ALTERNATIVE ELEVATIONAL DETAIL AND FENESTRATION TREATMENT WITH A HIPPED ROOF ON SINGLE STOREY ELEMENT FROM THAT GRANTED UNDER PLANNING REF: 07/20850
REVISED RIDGE HEIGHT AND FLOOR LEVEL, ALTERNATIVE ELEVATIONAL DETAILS AND FENESTRATION TREATMENT WITH A HIPPED ROOF ON SINGLE STOREY ELEMENT FROM THAT GRANTED UNDER PLANNING REF: 07/20850
10 YEAR PLANNING PERMISSION WHICH WILL CONSIST OF (1) UPGRADING OF APPROXIMATELY 0.7KM OF EXISTING ACCESS TRACK AND EXISTING SITE ENTRANCE, (2) CONSTRUCTION OF APPROXIMATELY 1.2KM OF NEW ACCESS TRACKS AND NEW SITE ENTRANCE, AND (3) CONSTRUCTION OF A 5.5M SPAN TEMPORARY BRIDGE AND ASSOCIATED ANCILLARY INFRASTRUCTURE
The brief summarizes the pattern across all 244 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351240The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.