Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 367 decisions within 5 km, 2 exact-site or onsite candidate records, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
INSTALLATION OF WASTEWATER TREATMENT AND DISPOSAL SYSTEM WITH ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF 1 NO. MODULAR CLASSROOM TOGETHER WITH ALL ASSOCIATED SITE WORKS
(1) REFURBISHMENT AND EXTENSION OF AN EXISTING STONE BUILT DWELLING, (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF NEW WASTEWATER TREATMENT PLANT AND (3) ALL ASSOCIATED WORKS AND SITE WORKS
(1) CONSTRUCTION OF A DWELLING HOUSE AND GARAGE ACCESSED USING EXISTING ENTRANCE OFF LOCAL RD. L-3263-3, (2) PROVISION OF A NEW EFFLUENT TREATMENT SYSTEM/PERCOLATION AREA TO THE NORTH OF THE PROPOSED HOUSE AND (3) ALL ASSOCIATED SITE WORKS RELATING TO THE ITEMS ABOVE INCLUDING DEFINED BOUNDARY TREATMENT
ERECTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE & DOMESTIC GARAGE WITH WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITEWORKS
The brief summarizes the pattern across all 367 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351296The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief