Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 842 decisions within 5 km, 4 exact-site or onsite candidate records, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF (1) A NEW 2023M2 TWO-STOREY SCHOOL BUILDING, CONTAINING: 2 NO. GENERAL CLASSROOMS; SPECIAL TEACHING ROOMS FOR SCIENCE, HOME ECONOMICS, AND DESIGN AND COMMUNICATION GRAPHICS; SPECIAL EDUCATION ROOMS; TOILETS; ANCILLARY SUPPORT SPACES AND 4 NO. SPECIAL NEEDS CLASSROOMS WITH ACCOMPANYING SEN SUPPORT SPACES AND SPECIAL TEACHING ROOMS FOR MULTISENSORY, PRACTICAL ACTIVITY, AND DAILY LIVING SKILLS, (2) A ROOF MOUNTED 4KW PHOTOVOLTAIC PANEL SYSTEM FOR COMPLIANCE WITH PART L OF THE BUILDING REGULATIONS AND (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING NEW LANDSCAPING, PARKING AREA AND ANCILLARY WORKS
ERECTION OF A NEW 2.4M HIGH FENCE TO PERIMETER OF EXISTING SCHOOL ALONG WITH ASSOCIATED SITEWORKS
CHANGE OF USE OF THE EXISTING TWO-STOREY SISTERS OF MERCY CONVENT BUILDING FROM RESIDENTIAL (CONVENT) USE TO EDUCATIONAL USE; EXTERNAL WORKS TO CONVENT BUILDING INCLUDING DEMOLITION OF EXISTING SIDE PORCH, PROVISION OF NEW ESCAPE DOORS AND REPLACEMENT OF EXISTING WINDOWS; INTERNAL REFURBISHMENT WORKS TO CONVENT BUILDING TO PROVIDE NEW CLASSROOMS, PRAYER ROOM, HORTICULTURE ROOM, KITCHEN, TOILETS AND ADDITIONAL ANCILLARY TEACHING /ADMINISTRATION ACCOMMODATION; ALONG WITH ASSOCIATED EXTERNAL SITEWORKS, NEW ONE-WAY TRAFFIC SYSTEM WITH PARKING AND DROP -OFF AREAS
(1) UPSIZING OF APPROXIMATELY 240M OF 225MM SEWER TO 450MM MINIMUM DIAMETER FROM THE JUNCTION OF CAHIR O'DOHERTY AVENUE AND CRANA ROAD TO OUTSIDE OSBORNE HOUSE ON SHORE ROAD, (2) UPSIZING OF APPROXIMATELY 150M OF 225/300MM SEWER TO 450MM MINIMUM DIAMETER FROM OUTSIDE OSBORNE HOUSE ON SHORE ROAD TO OPPOSITE REAR ENTRANCE TO SCOIL MHUIRE SECONDARY SCHOOL ON GRIANAN PARK, (3) UPSIZING OF APPROXIMATELY 375M OF 300/375MM SEWER TO 525MM MINIMUM DIAMETER FROM OPPOSITE REAR ENTRANCE TO SCOIL MHUIRE SECONDARY SCHOOL ON GRIANAN PARK TO NEAR THE JUNCTION OF AILEACH ROAD AND RAILWAY ROAD (R238), (4) UPSIZING OF APPROXIMATELY 100M OF 375MM SEWER TO 500/525MM MINIMUM DIAMETER FROM NEAR THE JUNCTION OF AILEACH ROAD AND RAILWAY ROAD (R238) TO THE SOUTHERN SIDE OF VICTORIA BRIDGE ON RAILWAY ROAD (R238). THIS SECTION INCLUDES A 500MM DUCTILE IRON PIPE CROSSING OF THE VICTORIA BRIDGE OVER THE MILL RIVER. THIS PIPELINE WILL BE SUSPENDED FROM THE UNDERSIDE OF THE EXISTING BRIDGE STRUCTURE, ADJACENT TO AND PARALLEL TO AN EXISTING PIPELINE, (5) UPSIZING OF APPROXIMATELY 155M OF 375MM SEWER TO 600MM MINIMUM DIAMETER FROM THE SOUTHERN SIDE OF VICTORIA BRIDGE ON RAILWAY ROAD (R238) TO THE WESTERN END OF THE DONEGAL COUNTY COUNCIL STORAGE COMPOUND, (6) UPSIZING OF APPROXIMATELY 15M OF 600MM SEWER TO 750MM MINIMUM DIAMETER FROM THE WESTERN END OF THE DONEGAL COUNTY COUNCIL STORAGE COMPOUND TO THE WWTP INLET, (7) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) DEMOLITION OF EXISTING ATTACHED GARAGE AND PORCH (2) ERECTION OF 2 STOREY EXTENSION TO SIDE & REAR OF EXISTING DWELLING AND SINGLE STOREY REPLACEMENT PORCH TO FRONT OF EXISTING DWELLING (3) CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS
RENOVATION AND EXTEND EXISTING DWELLING HOUSE TOGETHER WITH INTERNAL AND EXTERNAL ALTERATIONS AND ALL ASSOCIATED WORKS
The brief summarizes the pattern across all 842 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351515The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief