Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 100 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) CHANGE OF HOUSE DESIGN AND REPOSITIONING OF DWELLING HOUSE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND VEHICULAR ENTRANCE PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 22/50976 AND (2) CONSTRUCTION OF A DETACHED DOMESTIC GARAGE AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF DWELLING HOUSE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF A SINGLE-STOREY EXTENSION INCORPORATING A FLAT-ROOFED LINK TO THE GABLE OF THE EXISTING GATE COTTAGE TO INCLUDE THE RENOVATION AND REFURBISHMENT OF THE EXISTING COTTAGE, ENCOMPASSING ROOF REPAIRS, BARGE BOARD RESTORATION, WINDOW REPLACEMENT, RENDER REPAIR, AND ENERGY EFFICIENCY UPGRADES AND (2) INSTALLATION OF A DEDICATED WASTEWATER TREATMENT PLANT WITH POLISHING FILTER, TOGETHER WITH ALL ASSOCIATED SITE AND ANCILLARY WORKS
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF TWO DORMER WINDOWS TO FRONT (SOUTH) ROOF AND TWO DORMERS TO REAR (NORTH) ROOF AND OTHER MINOR ELEVATIONAL CHANGES, (2) REMOVAL OF EXISTING SUNROOM AND CONSTRUCTION OF A NEW WRAP AROUND ANNEX TO THE SOUTH-EAST SIDE OF THE HOUSE, (3) PROVISION OF A NEW PORCH CANOPY TO THE REAR, (4) INTERNAL RENOVATION WORK TO INCLUDE AN ADDITIONAL BEDROOM ON THE FIRST FLOOR AND CHANGE OF USE OF FORMER SWIMMING POOL AT BASEMENT LEVEL TO A STORE, (5) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PROVISION OF A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND (6) ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 100 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351516The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief