Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 246 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
INSTALLATION OF A DOMESTIC WASTE WATER TREATMENT SYSTEM AND PLACEMENT OF A MOBILE HOME ON THE SITE FOR TEMPORARY ACCOMMODATION WHILST RENOVATING THE EXISTING DWELLING
AS CONSTRUCTED SUB-STRUCTURES BUILDING WORKS COMPLETED TO THE DWELLING HOUSE UNDER GRANT OF PLANNING PERMISSION (06/21605 & 11/20426) AND PERMISSION FOR COMPLETION OF THE DWELLING HOUSE, CONSTRUCTION OF A DOMESTIC GARAGE, A WASTEWATER TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) TWO TEMPORARY MOBILE HOMES LOCATED ON THE SITE (2) SITE ENTRANCE, WASTEWATER TREATMENT SYSTEM, TEMPORARY STORAGE UNIT (PLANNING PERMISSIONS 07/20512 & 12/20145 REFERS) AND PERMISSION FOR CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE WITH FUTURE ATTIC DEVELOPMENT, DOMESTIC GARAGE, UPGRADING OF WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE, INSTALLATION OF A PROPRIETARY SEWERAGE TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKS
INSTALLATION OF A SEWERAGE TREATMENT PLANT AND SOIL POLISHING FILTER
The brief summarizes the pattern across all 246 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351588The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief