Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 437 decisions within 5 km, 3 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF TWO NO. DWELLING HOUSES IN THE FORM OF A SEMI DETACHED UNIT WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF 8 NO. DWELLING HOUSES IN THE FORM OF 4 NO. SEMI-DETACHED UNITS WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF AN EXTENSION TO THE SIDE OF DWELLING HOUSE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
NO. 5 & NO. 6 PARTIALLY BUILT SEMI-DETACHED DWELLINGS TO SUB-FLOOR LEVEL, CONNECTING TO EXISTING SEWAGE TREATMENT SYSTEM AND PERMISSION FOR COMPLETION OF CONSTRUCTION OF UNITS & ANCILLARY SITE WORKS
REPOSITIONING OF A SECTION OF THE EXISTING 38KV LINE KNOWN AS THE BALLYKEERAN, - CREESLOUGH, - GORTLEE, - GWEEDORE, 38KV OVERHEAD LINE WHICH IS REQUIRED DUE TO A CONFLICT WITH A PROPROSED COUNCIL HOUSING DEVELOPMENT. THE ALTERATION CONSISTS OF UNDERGROUNDING OF 250M OF THE OVERHEAD LINE AND ERECTION OF (2) 3 POLE STRUCTURES WITH STAYS
(1) CHANGE OF USE OF AN EXISTING AGRICULTURAL SHED TO A DOMESTIC DWELLING HOUSE, TO INCLUDE ALTERATIONS TO EXISTING ELEVATIONS (2) CONSTRUCTION OF A SIDE AND REAR EXTENSION TO ABOVE MENTIONED EXISTING BUILDING (3) DEVELOPMENT OF NEW VEHICLE ENTRANCE TO THE PUBLIC ROAD, TO INCLUDE ALTERATIONS TO EXISTING PUBLIC FOOTPATH (4) CONNECTION TO THE PUBLIC SEWER VIA AN EXISTING ADJACENT FOUL DRAINAGE SYSTEM (5) CONSTRUCTION OF A DOMESTIC GARAGE (6) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 437 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351594The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief