Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 91 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF EXTENSION TO THE EAST SIDE OF THE EXISTING DWELLING HOUSE WITH REQUIRED SITE WORKS
(A) RETENTION AND COMPLETION OF SITE ACCESS ROAD INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS & (B) CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM
ERECTION OF AN EXTENSION TO DWELLING HOUSE, INSTALLATION OF A WASTEWATER TREATMENT SYSTEM, NEW ENTRANCE TO SERVICE DWELLING HOUSE AND ASSOCIATED SITE WORKS
(1) DOMESTIC GARAGE AS CONSTRUCTED, (2) CHANGE OF USE OF FIRST FLOOR FROM DOMESTIC GARAGE TO ANCILLARY ACCOMMODATION AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
EXISTING BASE AS CONSTRUCTED AND PERMISSION FOR ERECTION OF A DWELLING HOUSE ON EXISTING BASE AND INSTALLATION OF WASTEWATER TREATMENT SYSTEM WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
(1) REFURBISHMENT OF EXISTING DWELLING HOUSE, (2) ERECTION OF AN EXTENSION ONTO EXISTING DWELLING HOUSE, (3) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM AND (4) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 91 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351852The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief