Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 197 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
(1) A NEW 1,951.2M2 TWO STOREY SCHOOL BUILDING, CONTAINING 11 NO. GENERAL CLASSROOMS, SPECIAL TEACHING ROOMS FOR SCIENCE, ART AND BUSINESS STUDIES, OFFICES, TOILETS, STORES, PLANT ROOMS AND A FIRST FLOOR BRIDGE LINK TO THE EXISTING SCHOOL BUILDING, (2) A ROOF MOUNTED PHOTOVOLTAIC PANEL SYSTEM FOR COMPLIANCE WITH PART L OF THE BUILDING REGULATIONS AND (3) ALL ASSOCIATED SITE WORKS INCLUDING NEW LANDSCAPING, EXTERNAL STEPS TO EXISTING GRASS PLAY, AND ASSOCIATED SITE DEVELOPMENT AND SERVICE INFRASTRUCTURE WORKS
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION CONTAINING 2 NO. CLASSROOMS, 2 NO. SET ROOMS AND ANCILLARY ACCOMMODATION (2) REALIGNMENT AND WIDENING OF EXISTING FOOTPATH AND BOUNDARY WALL TO PROVIDE NEW ROADSIDE DROP OFF AREA WITH 6NO. SPACES ALONG WITH NEW SCHOOL ACCESS GATES (3) PROVISION OF NEW ACCESS GATE TO NORTHEAST SIDE OF SITE FOR EMERGENCY ACCESS AND MAINTENANCE ONLY (4) INSTALLATION OF 2 KWP SOLAR PV PANEL TO SOUTH FACING ROOF OF REAR BLOCK (5) PROVISION OF ELECTRIC VEHICLE CHARGING POINT (6) EXTENSION OF EXISTING PLAY AREA TO NORTHWEST OF SITE (7) PEDESTRIAN CROSS AT SCHOOL GATES (8) ALL ASSOCIATED WORKS AND SITE WORKS
EXTENSION TO FRONT ELEVATION OF EXISTING DWELLING AND CONNECTION TO EXISTING SEWER MAIN
(1) DEMOLITION OF EXISTING HABITABLE DWELLING HOUSE (2) ERECTION OF A NEW DWELLING HOUSE AND CONNECTION TO EXISTING ANCILLARY SERVICES
ERECTION OF NEW EXTENSION TO SIDE OF EXISTING DWELLING HOUSE
DEMOLITION OF EXISTING DWELLING HOUSE AND ERECTION OF NEW DWELLING HOUSE WITH USE OF EXISTING ANCILLARY SERVICES
The brief summarizes the pattern across all 197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2450210The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief