Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,204 decisions within 5 km, 3 exact-site or onsite candidate records, and 64 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
64 structured nearby appeal records.
64 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
EMERGENCY ESCAPE DOOR TO THE EXTERNAL WALL OF UNIT 31 ON THE SOUTH ELEVATION ADJACENT TO THE SOUTH ENTRANCE OF THE SHOPPING CENTRE
(1) DEMOLITION OF AN EXISTING HABITABLE DWELLING (2) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EAST SIDE OF THE EXISTING PREMISES TO PROVIDE A DINER WITH DRIVE THRU FACILITY, KITCHEN AND ASSOCIATED FACILITIES (3) CHANGE OF USE FROM PREVIOUSLY GRANTED PLAYSCHOOL TO SHOP STORE AND ACCESS CORRIDOR TO UPPER FLOORS (4) MATERIAL ALTERATIONS INTERNALLY TO RECONFIGURE THE SHOP FLOOR AREA TO PROVIDE FOR SANITARY AND STORE ACCOMMODATION (5) ALTERATIONS TO THE EXISTING FENESTRATION AT GROUND FLOOR LEVEL AND REMOVAL OF A GLAZED LOBBY TO THE REAR ELEVATION FOR THE GROUND FLOOR ALTERATIONS (6) INSTALLATION OF A PUMPING STATION AND CONNECTION TO THE EXISTING PUBLIC SEWAGE SYSTEM (7) ALL ASSOCIATED SITE WORKS INCLUDING RECONFIGURATION OF CAR PARKING
CHANGE OF USE OF EXISTING OFFICES TO NEW DENTAL SURGERY
REVISION TO PREVIOUSLY APPROVED PERMISSION (PLAN. REF. NO. 13/80091, EXTENDED UNDER PLAN. REF. NO. 19/50059 REFERS) CONSISTING OF CONSTRUCTION OF A NEW BIOMASS HEATING CENTRE, AS PART OF THE NORTH-WEST REGIONAL SCIENCE PARK PROJECT. SITE C.056HA LOCATED WEST OF THE MAIN BUILDING OF LETTERKENNY IT CAMPUS. THE FOOTPRINT OF THE BUILDING REMAINS UNCHANGED. THE LOCATION HAS BEEN MODIFIED IN ORDER TO ALLOW FOR FUTURE EXTENSION TO THE LYIT CAMPUS BUILDING AND "GREENWAY" ROUTE. THE 83 SPACE CAR-PARKING AREA INCLUDED IN THE ORIGINAL GRANT OF PERMISSION HAS BEEN REMOVED
INSTALLATION OF SOLAR PV PANELS TO THE EXISTING FUEL STATION CANOPY STRUCTURE
CONSTRUCTION OF A BOUNDARY WALL WITH IRON RAILING ON TOP AND INSTALLATION OF IRON GATES WITH ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 1,204 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2450215The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief