Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 330 decisions within 5 km, 4 exact-site or onsite candidate records, and 17 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
17 structured nearby appeal records.
17 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a residential development of 51 residential units on a 1.99 hectare site (1.83 development area), comprising the following two storey dwellings • 4 no. four bedroom detached dwellings, • 4 no. four bedroom semi-detached dwellings, • 8 no. three bedroom semi -detached dwellings, • 7 no three bedroom mid terraced dwellings, • 10 no three bedroom end of terrace, • 6 no two bedroom end of terrace dwellings, • 7 no two bedroom mid terrace dwellings, • 1 no. two bedroom detached dwelling, • 4 no one bedroom maisonettes over two storeys and all associated site development works including ESB substation, car parking, fencing, boundary walls, foul and surface water drainage including a pumping station, bicycle parking, bin storage, landscaping and amenity areas and a revised vehicular access including the setting back of the existing front boundary wall. A Natura Impact Statement has been prepared in respect of the proposed development.
I) change of use from office block to self-catering guest accommodation/short term let accommodation to include No.4 two-bedroom units, No.8 carparking spaces, ii) permission for an extension to the side to accommodate a new stairwell, iii) renovation of existing building to include a bin-bay and bicycle rack iv) demolish existing industrial structures to the rear of the proposed development and all associated site works.
Restore and alter the existing dwelling and outhouses, extension to the existing dwelling, new vehicular access from the L16566 public road, a new wastewater treatment system and all associated site works.
Construct dwelling house, new site entrance and all associated site works.
Provide an all weather playing pitch, fencing, lights and all associated ancillary works
Provide a playing pitch and all associated ancillary facilities, works and services
The brief summarizes the pattern across all 330 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460167The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief