Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
23% of nearby decided applications were refused. The site check found 296 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Chun Teach nua cónaithe a thógáil chomh maith le Garáiste nua agus Córás searachais nua ag an seoladh thuas. Spás urláir comhlán na n-oibreacha beartaithe: 169.70 sqm (house) & 55.00 sqm (garage)
For a dwellinghouse and wastewater treatment system. Gross floor space of proposed works: 208.38 sqm
For development which will consist of: 'Soilsiú seachtrach an tsuímh, atá ann cheana féin, suiteáite ag scoil a choinneáil ann.'
Chun (1) athraithe ar an teach cónaithe a fuair cead pleanála cheanna faoin uimhir tagartha 11/514, (2) athraithe don garáiste le taobh an tí a fuair cead pleanála cheanna faoin uimhir tagartha 11/514 chun gur féidir é a úsáid mar seomra cleachtadh damhsa agus mar seomra aclaíochta, (3) cead coinneála do spas stórala breosla. Gross floor space of work to be retained 443.10 sqm.
Le haghaidh pleánanna athbreithnithe an tí/agus garáiste a bhí ceadaithe theanna fhein faoi uimhir pleanail (11/219 & 16/338, chomh maith le cead chun an gáiriste a athrú isteach ina aonad féinchuimsiteach (Granny Flat) agus cead chun corás searachais nua a thógáil a bhí ceadaithe faoi (11/219 & 16/338) freisin. Spás urláir comhlán na n-oibreacha beartaithe: Teach - 203 sqm, Garáiste - 69 sqm
To erect dwelling house with carport, with tertiary effluent treatment system, percolation area, along with all associated site works. Gross floor space of proposed work: 253.82 sqm (house) & 31.00 sqm (carport)
The brief summarizes the pattern across all 296 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461084The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief