Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 403 decisions within 5 km, 7 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CHANGE OF USE OF THE GROUND FLOOR OF AN EXISTING BUILDING KNOWN AS THE HMD BUILDING FROM A RESTAURANT TO 4 NO. RETAIL UNITS INCLUDING THE INSTALLATION OF EXTERNAL ILLUMINATED SIGNAGE TO EACH UNIT
(1) CHANGE OF USE OF THE GROUND FLOOR OF AN EXISTING BUILDING KNOWN AS THE HMD BUILDING FROM A RESTAURANT TO A YOUTH AND FAMILY RESOURCE CENTRE AND (2) EXTERNAL ILLUMINATED SIGNAGE
(1) CHANGE OF USE FROM A FORMER BANK TO A HARDWARE SHOP, (2) ERECTION OF (A) A COMMERCIAL STORAGE SHED AND (B) A PERIMETER FENCE AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF 44 NO. NEW HOTEL BEDROOMS AND GYM WITHIN A NEW 3 STOREY BLOCK, THE CHANGE OF USE OF EXISTING STORAGE AREA AT GROUND FLOOR LEVEL IN THE EXISTING 3 STOREY BLOCK TO THE REAR OF THE SITE TO PROVIDE OF 8 NO. ADDITIONAL BEDROOMS AT GROUND FLOOR LEVEL (52 NO. NEW BEDROOMS OVERALL), THE EXISTING 28 NO. HOTEL BEDROOMS ARE TO BE RENOVATED CREATING A TOTAL OF 80 NO. BEDROOMS. IT IS PROPOSED TO PROVIDE 2 NO. 2 STOREY EXTENSIONS TO THE FRONT OF THE STREET FACADE (WEST ELEVATION FRONTING THE R257) OF THE EXISTING HOTEL BAR AND RESTAURANT TO PROVIDE A CAFE AND ADDITIONAL RESTAURANT AREA AT GROUND FLOOR LEVEL AND THE CONSTRUCTION OF 2 NO. FIRST FLOOR APARTMENTS. IT IS ALSO PROPOSED TO CARRY OUT INTERNAL ALTERATIONS TO THE RESTAURANT, RECEPTION AREA, NEW TOILETS AND PLANT ROOMS AND DEMOLITION OF PART OF THE BUILDING TO REMOVE THE EXISTING NIGHTCLUB AND TOILET BLOCK TO FACILITATE THE NEW HOTEL ROOMS AND GYM. ANCILLARY CAR PARKING (94 CAR SPACES) AND COACH SET DOWN FOR PATRONS OF THE HOTEL, AND ALL ASSOCIATED SITE DEVELOPMENT AND ENGINEERING WORKS INCLUDING A NEW WASTEWATER TREATMENT PLANT NECESSARY TO FACILITATE THE DEVELOPMENT.
(1) CHANGE OF USE OF APPROVED COMMERCIAL UNIT TO USE AS A SINGLE DWELLING HOUSE INCLUDING CHANGES TO FENESTRATION, EXTERNAL ELEVATIONS, ROOF PROFILE AND FINISHES, (2) PROVISION OF ACCOMMODATION AT FIRST FLOOR / ROOFSPACE LEVEL AS PART OF PROPOSED DWELLING UNIT WITH ASSOCIATED MODIFICATIONS TO ELEVATIONS, (3) CHANGE OF USE OF APPROVED RETAIL UNITS AT BASEMENT LEVEL TO PROVIDE 1 NO. 2 BEDROOM APARTMENT AND 2 NO. STUDIO APARTMENTS, ONE OF WHICH IS TO BE USED SOLELY AS ANCILLARY ACCOMMODATION TO MAIN DWELLING UNIT AND (4) PROVISION OF DOUBLE GARAGE WITH HOME OFFICE OVER PART OF SAME AT FIRST FLOOR AND PROVISION OF ROOF BALCONY OF PART OF GARAGE AT FIRST FLOOR
DEMOLITION OF EXISTING SCHOOL BUILDING (S) KNOWN AS "ARDSCOIL MHUIRE" AND THE CONSTRUCTION OF 30 NO. DWELLING UNITS (2,3,4 & 5 BEDS), CONNECTION TO EXISTING STORM DRAINAGE NETWORK ON PUBLIC ROAD (R-257-12), COLLECTION OF FOUL SEWAGE TO NEW ON SITE PUMPING STATION AND THEREAFTER PUMPED TO REAR (EAST) OF SITE INTO PROPOSED NEW 350M LONG GRAVITY FOUL SEWER IN A SOUTH EAST DIRECTION ALONG PUBLIC ROAD (L-1383-1) CONNECTING TO EXISTING FOUL SEWER AT INDUSTRIAL ESTATE ROUNDABOUT INCLUDING ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 403 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461384The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief