Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
35% of nearby decided applications were refused. The site check found 40 decisions within 5 km, 4 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a dwelling house, secondary wastewater treatment unit and soil polishing filter, together with associated site works.This application will be accompanied by a Natural Impact Statement (NIS) and a Construction Environmental Management Plan (CEMP). Gross floor space of proposed works: 144.00 sqm
For the construction of a dwelling house, secondary wastewater treatment unit and soil polishing filter, together with associated site works. This application will be accompanied by a Natura Impact Statement (NIS) and a Construction Environmental Management Plan (CEMP). Gross floor space of proposed works: 144 sqm(H)
For a change of use of part of an agricultural barn to use as a microbrewery and to install an effluent treatment system. A Natura Impact Statement will be lodeged with the application. Gross floor space of proposed works: 24 sqm
For development of two camping pods at the existing campsite at Inishbofin hostel. Gross floor space of proposed works 4.6sqm.
For: 1. Renovations and extension to existing cottage, 2. New onsite sewage treatment plant, percolation area and all associated works, 3. A Natura Impact Statement (NIS) has also been included with the application. Gross floor space of proposed works: 40 sqm
To demolish existing agricultural sheds and to construct an agricultural barn which will be used for the purpose of fodder storage and the storage of agriculture related materials. A Natura Impact Statement will be lodged with this application. Gross floor space of proposed works: 228.50 sqm. Gross floor space of any demolition: 48.50 sqm (Agricultural)
The brief summarizes the pattern across all 40 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461391The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief