Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 60 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Of converted attic of existing dwelling house including 2No. roof-lights on rear elevation, turf shed and garage on revised site boundaries and all associated site works. Gross floor space of work to be retained: 46.30 sqm(attic), 48.05 sqm(garage). 187.34 sqm(H)
To develop an existing entrance and upgrade it to forestry harvesting standard (bell mouth entrance) onto public road to facilitate access to forestry plantation together with internal access road and turning head and all associated site works
To erect a dwelling house and domestic garage/store and install a septic tank system and percolation area and all associated site works. Gross floor space of proposed works: House 263.12 sqm, Garage 51.13 sqm
To construct a bell mouth entrance onto public road to facilitate access to existing forestry plantation together with internal access road to forestry and all associated site works
For the construction of two forest access roads and two entrances.
Of two forest road entrances, associated access roads, and ancillary site works, which were constructed at variance with the details approved under Planning Permission Ref. 18/58
The brief summarizes the pattern across all 60 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461538The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief