Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 834 decisions within 5 km, 5 exact-site or onsite candidate records, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLITION OF EXISTING SHED, (2) ERECTION OF AN EXTENSION TO EXISTING DWELLING AND (3) WIDENING OF EXISTING DRIVEWAY, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
CHANGE OF USE FROM A DWELLING TO A PLAYSCHOOL AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF AN 18M MONOPOLE STRUCTURE CARRYING ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT WITH A CABINET AT GROUND LEVEL, ALL SURROUNDED BY SAFETY BOLLARDS
EXTENSION INCORPORATING DINING AREA TO SIDE OF THE LAKE OF SHADOWS HOTEL AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF ALL EXISTING SCHOOL BUILDINGS AND THE REMOVAL OF ALL TEMPORARY MOBILE CLASSROOM BUILDINGS, (2) CONSTRUCTION OF A TWO STOREY PRIMARY SCHOOL BUILDING, SCOIL ÍOSAGÁIN (6,322 SQM GROSS FLOOR AREA) WITH ASSOCIATED EXTERNAL SIGNAGE. THE CONSTITUENT ELEMENTS OF THE NEW SCHOOL BUILDING COMPRISE OF (A) A TWO STOREY 25 NO. GENERAL CLASSROOMS AND 9 NO. SPECIAL NEEDS CLASSROOM ELEMENTS INCLUDING LIBRARY, THERAPY ROOMS, OFFICES/GROUPS ROOMS/TOILETS, STAFFROOM, STORES AND ASSOCIATED ANCILLARY ACCOMMODATION, (B) DOUBLE HEIGHT GENERAL PURPOSE ASSEMBLY HALL/DINING HALL (FOR SCHOOL USE), (3) SITE DEVELOPMENT WORKS INCLUDING REVISIONS TO VEHICULAR/PEDESTRIAN & CYCLE ACCESS ARRANGEMENTS TO PROVIDE CAR AND BUS SET DOWN SPACES; INCLUDING 55 NO. STANDARD CAR PARKING SPACES, 4 NO. UNIVERSALLY ACCESSIBLE PARKING SPACES AND CYCLE PARKING SPACES AND A NEW VEHICULAR ACCESS FROM ST. MARY'S ROAD AND (4) 3 NO. BALL COURTS. THE PROPOSED DEVELOPMENT INCLUDES HARD AND SOFT LANDSCAPING (INCLUDING BOUNDARY TREATMENTS, SCHOOL GARDEN AND SITE ATTENUATION), AND ASSOCIATED SITE DEVELOPMENT AND SERVICES WORKS
ERECTION OF A DWELLING WITH CONNECTION TO EXISTING MAINS SEWER AND PUBLIC SERVICES
The brief summarizes the pattern across all 834 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461689The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief