Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
27% of nearby decided applications were refused. The site check found 48 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedZoning and settlement layers were intersected with the selected site against the loaded source datasets.
2 matchedOne current citation from the Galway County Council development plan, with section, page and source URL.
1 matched3 of 4 layers are loaded for Galway County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedCitations are current-dated and carry policy name, section, page and source URL from the Galway County Council development plan.
1 matchedOpen preview
Open preview
Chun teach cónaithe agus córas séarachais a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 141 sqm
For the erection of a 12m high wooden pole with a single receiver dish, a two bay cabinet, a wooden fence with poles and rails, an access gate, a fiber room, a concrete plinth and a trunk cover to run a duct and cable outlet up the defend pole. The development is necessary to transport broadband data from the new high-speed fiber network on the island to the mainland through the radio connection, to connect to the NBI national fiber network as part of the government's national plan to provide high-speed broadband to all parts of the country that is not commercially available, including the islands, at the same data speed
Chun stablaí a thogail. Spás urláir comhlán na n-oibreacha beartaithe: 117.8 sqm
Chun stablaí capall a thogail ar Inis Óirr, Oileann Árainn. Gross floor space of proposed works 118.9 sqm.
Chun seid talmhaíochta a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 69.94 sqm
Chun teach cónaithe, garáiste. córas séarachais agus seirbhísí gaolmhar a thógáil
The brief summarizes the pattern across all 48 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2461706The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief