Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 187 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF AN EXTENSION COMPRISING OF A DOMESTIC STORE AND ALL ASSOCIATED SITEWORKS
DOMESTIC STORE AND PERMISSION FOR CONSTRUCTION OF A NEW POLISHING FILTER TO SERVE EXISTING TREATMENT SYSTEM FOR DWELLING ON THE SAME SITE
(A) REVOVATION OF EXISTING COTTAGE (B) DEMOLITION OF PORTION OF EXISTING REAR EXTENSION TO SAME (C) ERECTION OF REAR EXTENSION AND (D) ALL ASSCOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT UNIT AND POLISHING DISPOSAL INFILTRATION PAD AND ALL ASSOCIATED SITE WORKS
EXISTING TWO STOREY DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS
(1) A 38KV UNDERGROUND CABLE GRID CONNECTION APPROXIMATELY 9KM IN LENGTH FROM THE CONSENTED DERRYKILLEW COMMUNITY WIND FARM (AN BORD PLEANÁLA REF. NO. 307520, DONEGAL COUNTY COUNCIL REF. NO. 19/51750) TO LANDS AT TOWNPARKS, NORTH OF THE EXISTING CATHALEEN'S FALL 110KV SUBSTATION IN BALLYSHANNON, (2) A PARTIAL SECTION OF A 38KV OVERHEAD LINE GRID CONNECTION CROSSING 130M OVER THE RIVER ERNE AT CATHALEEN'S FALL, BALLYSHANNON, AND (3) THE DERRYKILLEW COMMUNITY WIND FARM 38KV SUBSTATION AND A BATTERY ENERGY STORAGE SYSTEM. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ACCOMPANIES THIS APPLICATION
The brief summarizes the pattern across all 187 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461815The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief