Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 216 decisions within 5 km, 4 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CHANGE OF HOUSE AND GARAGE DESIGN CONSISTING OF A PART SINGLE STOREY, PART STOREY AND A HALF HOUSE DESIGN WITH SINGLE STOREY DETACHED DOMESTIC GARAGE AND MODIFICATIONS TO EXISTING APPROVED SEWAGE SYSTEM PREVIOUSLY PERMITTED (PLANNING REF. NO. 23/50658 REFERS) INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING STORAGE SHED, (2) CONSTRUCTION OF A MONO PITCH ROOFED CONTEMPORARY STYLE DWELLING CONSISTING OF PART SINGLE STOREY AND PART TWO STOREY, WITH PROVISION OF A FLAT ROOF CARPORT TO THE REAR, (3) CONSTRUCTION OF A DETACHED MONO PITCH ROOFED DOUBLE GARAGE, (4) INSTALLATION OF A SEWAGE TREATMENT SYSTEM AND (5) ALL ASSOCIATED SITE WORKS AND SERVICES, INCLUDING NEW VEHICULAR ENTRANCE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) DEMOLITION OF EXISTING STORAGE SHED (2) CONSTRUCTION OF A MONO PITCH ROOFED CONTEMPORARY STYLE DWELLING CONSISTING OF PART SINGLE STOREY, PART TWO STOREY WITH PARTIAL BASEMENT STORAGE UNDER PROVISION TO THE REAR OF A FLAT ROOF CARPORT LINKING A MONO PITCH ROOFED DOUBLE GARAGE (3) INSTALLATION OF SEWAGE TREATMENT SYSTEM (4) ALL ASSOCIATED SITE WORKS AND SERVICES INCLUDING NEW VEHICULAR ENTRANCE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) DEMOLITION OF EXISTING STORAGE SHED (2) CONSTRUCTION OF A MONO PITCHED ROOFED CONTEMPORARY STYLE DWELLING CONSISTING OF PART SINGLE STOREY, PART TWO STOREY WITH PARTIAL BASEMENT STORAGE UNDER, PROVISION TO THE REAR OF A FLAT ROOF CARPORT LINKING A MONO PITCH ROOFED DOUBLE GARAGE (3) INSTALLATION OF A SEWAGE TREATMENT SYSTEM (4) ALL ASSOCIATED SITE WORKS AND SERVICES, INCLUDING NEW VEHICULAR ENTRANCE
DEMOLITION OF EXISTING MICA DAMAGED DETACHED DWELLING AND CONSTRUCTION OF REPLACEMENT DWELLING AND CONNECTION TO EXISTING SERVICES AND ANCILLARY SITE WORKS
EXTENSION TO SINGLE STOREY SUN ROOM AND NEW ROOF STRUCTURE TO SUN ROOM TO FRONT OF EXISTING DWELLING HOUSE
The brief summarizes the pattern across all 216 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461920The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief