Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 221 decisions within 5 km, 1 exact-site or onsite candidate record, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) PARTIAL DEMOLITION AND REFURBISHMENT OF EXISTING DERELICT DWELLING HOUSE AND (2) ERECTION OF AN ORANGERY EXTENSION TO THE BUILDING INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF GARDEN SHED AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW SPLIT LEVEL PART SINGLE STOREY PART TWO STOREY STYLE DWELLING HOUSE, DETACHED DOMESTIC GARAGE, NEW SITE ENTRANCE, A SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF TWO-STOREY DWELLING WITH ATTACHED SINGLE STOREY DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW DWELLING HOUSE, INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND A SURFACE WATER ATTENUATION TANK AND ALL ASSOCIATED SITE WORKS AND CONNECTION TO ALL EXISTING SERVICES
ERECTION OF NEW DWELLING HOUSE AND SEWAGE TREATMENT PLANT
The brief summarizes the pattern across all 221 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461994The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief